Fort Assembly
Phase 5
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (1) M2 - FLOOR RUNNER - W101498
• (2) L5 - OUTER FLOOR BOARD - W101486
• (17) M3 - FLOOR BOARD - A101458
Hardware needed:
• (76) CK - SCREW PFH 8x2 - H100111
• (19) BR - SCREW PFH 8x1-1/8 - H100088
Step 1: Pre-drill & attach 'L5' Outer
Floor Board to 'J1' Floor Supports
using Screws 'CK', as shown.
L5
CK
M3
BR
M2
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Step 2: Pre-drill & attach 'M3' Floor
Board to 'H1' & 'H2' Floor Rails using
Screws 'CK', as shown.
H2
H1
Step 3: Attach 'M2' Floor Runner to
the center of 'L5' Outer Floor Boards
& 'M3' Floor Boards using Screws
'BR', as shown.
Note: Do not overtighten screws, overtightening
may cause the screw to stick through the boards
and may cause sharp points. The head of the
screw should NOT sink into the wood for this
phase, it should be flush.