Phase Notes
• Assemble with hardware as shown.
Fort Assembly
Phase 16
Step 1: Arrange door
assembly boards, as shown.
Pre-drill and attach 'O1' Door
Supports to 'L9', 'M19', 'M21' &
'L10' Door Boards using
Screws 'BR', as shown.
Step 2: Pre-drill and attach 'FR' Leaf
Hinge Assembly to 'L10' Door Board
using Screws 'CX', as shown.
Step 3: Attach 'HZ' Knob to 'L9' Door
Board using Screw 'BR'. Center and
attach 'GK' Window Frame Green to
Door Assembly using Screws 'BC', as
shown.
Hardware needed:
• (37) BR - SCREW PFH 8x1-1/8 - H100088
• (4) BC - SCREW PWH 8x3/4 - H100070
• (10) CX - SCREW #4x5/8 - H100127
Parts needed:
• (1) L9 - DOOR BOARD - W101233
• (2) M19 - DOOR BOARD - W101230
• (2) M21 - DOOR BOARD - W101232
• (2) M22 - DOOR BOARD - W101231
• (1) L10 - DOOR BOARD - W101229
• (3) O1 - DOOR SUPPORT - W101234
• (1) GK - WINDOW FRAME GREEN 216x267 - A100146
• (1) HZ - KNOB - A100071
• (2) FR - LEAF HINGE - A100093
L9
L10
M19
M21
M19
HZ
BR
O1
O1
BR
BR
FR
CX
CX
L10
BC
GK
O1
BR
FR
CX
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
M22