Fort Assembly
Phase 23
Parts needed:
• (1) ROOF ASSEMBLY
• (2) M8 - WALL RAIL - W101454
Hardware needed:
• (4) V - BOLT HEX 5/16x5 - H100022
• (4) AC - WASHER LOCK EXT 8x19 - H100030
• (4) BG - T-NUT 5/16 - H100074
• (22) BR - SCREW PFH 8x1-1/8 - H100088
Phase Notes
• Assemble with hardware as shown.
Step 1: Attach the Roof Assembly to 'M8'
Wall Rail using Bolts 'V' and Washer 'AC'
into T-Nut 'BG' on the back side of 'M8'
Wall Board, as shown.
M8
V
AC
M8
V
AC
ROOF ASSEMBLY
ROOF ASSEMBLY
Note: It is vital that the fort
be level before and after
each phase of assembly.
Step 2: Attach the Roof Assembly to 'M8'
Wall Rail using Bolts 'V' and Washer 'AC'
into T-Nut 'BG' on the back side of 'M8'
Wall Board, as shown.
Step 3: Attach the 'M8' Wall Rails to 'M5'
Wall Boards using screws 'BR', as shown.
M5