STEP 24
Now install five M3 Floor
Boards on Top-Lower Floor
spacing evenly using 2” Wood
Screws.
STEP 25
Attach L1, four-hole Floor Board,
between Tower Posts flushing to
outside of Left and Right Floor Rail on
Bottom Floor and between C3 Posts.
At this point, install Lower Deck Floor
Boards, M3, using 2” Wood Screws
spacing fifteen M3 Floor Boards evenly.
C1
C1
C3
C3
H7
M3
11/16 x 3-3/8 x 47 [ 1.74 x 8.57 x 119.38 ]
M3 Floor Board * 5 Holes * 24 Req
© Leisure Time Products Inc.
Next Generation 5007 10-0409 Version 4
Page 21
STEP 23
Attach G4, eight-hole, Clubhouse Wall Rail
to C2 Post using 5/16 x 3-3/4” Hex Bolts,
Internal Tooth Lock Washers, Flat Washers
and Spike T Nuts.
G2
G2
C1
C1
C2
C2
H3
H6
G4
1 x 5-1/2 x 47 [ 2.54 x 13.97 x 119.38 ]
G4 Club House Wall Rail * 8 Holes * 1 Req
5/16 X 3-3/4"
HEX
HEAD
BOLT
5/16"
SPIKE TEE
NUT
5/16"
INTERNAL
TOOTH
LOCK
WASHER
5/16" FLAT
WASHER
#8 X 2"
WOOD
SCREW
M3
L1
C3
C3
Meijer.com
Summary of Contents for Next Generation 5007
Page 3: ...Meijer com...