6 Ft Rock Wall Green
Phase 2
Phase Notes
• Assemble middle support with screws as shown. See detail below.
• Using slats as a guide, pre-drill edge of middle support with a 1/8"
drill bit. Failure to pre-drill may result in board splitting.
SCREW PFH 8x1-1/2
CENTER RAIL IS FLUSH WITH TOP
EDGES OF OUTER RAILS
PRE-DRILL FOR EACH SCREW
TOP
TOP
M74
F74
QTY DESCRIPTION LABEL
23 SCREW PFH 8x1-1/2 PB
1 CENTER RAIL F74