Phase Notes
• Assemble with hardware as shown.
Bounce Tube Green & Yellow
Phase 4
Step 1: Align 'KK' Clevis bolt holes with bounce
tube mounting holes. Insert clevis bolt through the
previously aligned holes and secure using the lock
nut provided with the clevis, as shown. Now, attach
'LK' Bounce Tube Spring to 'KK' Clevis by hooking
one bounce tube spring end through the clevis, as
shown. Finally, attach 'FA' Quick Link to bounce
tube spring by hooking quick link over bounce tube
spring hook, as shown. Attach 'FA' quick link to
eyebolts mounted into the swing set.
FA
KK
Hardware needed:
• (4) FA - QUICK LINK - A100069
• (4) LK - BOUNCE TUBE SPRING - H100149
• (4) KK - CLEVIS W/ BOLT & LOCK NUT - H100148
Step 2: Repeat step 1 for the remaining bounce
tube hanger assemblies.
FA
KK