Fort Assembly
Phase 2
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (2) B1 - ANGLED UPRIGHT - W101610
• (2) B2 - ANGLED UPRIGHT - W101670
Hardware needed:
• (8) P - BOLT WH 5/16x3 - H100016
• (8) AC - WASHER LOCK EXT 8x19 - H100030
• (8) AD - WASHER LOCK EXT 12x19 - H100031
• (8) E - NUT BARREL WH 5/16x1-3/4 - H100007
Step 1: Attach 'B1' Angled Upright to
'H1' Floor Support Boards using
hardware 'E','AD','AC' & 'P', as shown.
H1
AC
P
AD
E
B1
P
AC
H1
AD
E
B2
B2
B1
H1
Step 2: Attach 'B2' Angled Upright to
'H1' Floor Support Boards using
hardware 'E','AD','AC' & 'P', as shown.
Note: It is vital that the fort
be level before and after
each phase of assembly.