MONKEY BAR
ASSEMBLY
STEP 1
TIP:
SCREW TAPPING 14x1-1/2
USE A #3 PHILLIPS BIT.
TRIANGLE
PLATE 100° 5
HOLE
(x2)
A100294
L BRACKET
2.5x38x55x55
(x4)
A4M01046
METAL RUNG 559 GREEN
(x4)
A100045
MONKEY BAR RAIL - W4L15936
1 3/8"x3 3/8"x77 1/8" (36x86x1959)
E4
(x2)
LAG SCREW WH
1/4x1 1/2
(x8)
H100145
T-NUT
5/16
(x6)
H100074
NUT LOCK
5/16
(x2)
H100110
BOLT WH
5/16x1 1/4
(x6)
H100009
BOLT WH
5/16x2
(x2)
H100012
WASHER FLAT
8x27
(x2)
H100105
046
(x4)
L BRACKET 2.5x38x55x55
045
(x4)
METAL RUNG 559 GREEN
294
(x2)
TRIANGLE PLATE 100° 5 HOLE
012
(x2)
BOLT - 2"
105
(x2)
WASHER - 8x27
110
(x2)
NUT - 5/16"
145
(x8)
LAG SCREW - 1 1/2"
009
(x6)
BOLT - 1 1/4"
074
(x6)
T-NUT - 5/16"
E4
(x2)
NOTE:
PILOT HOLES
IN RAILS FACE
UPWARD.
NOTE:
BRACKETS FLUSH WITH
END OF BOARD
NOTE:
ANGLE CUT
OF BOARD
TIP:
INSTALL T-NUTS INTO
BOARDS BEFORE ASSEMBLY.
41