26
FINISH
Your front wall header is installed.
PARTS REQUIRED:
FRONT WALL HEADER
CENTER
CENTER
3" (7,6 cm)
x5
3" (7,6 cm)
Screws
Flush to
panel edge
Flush
Front wall
panel
OY
SZ
OY
Fig. A
x1
OY
2 x 3 x 72" (5,1 x 7,6 x 213,4 cm)
BEGIN
¸
1
Center
OY
on
SZ
flush to edge of panel
(Fig. A)
.
Secure with (5) 3" screws spaced evenly, as shown.