1-1/2"
(3,8 cm)
41-1/2"
72"
96"
116-3/4"
120"
80-5/8"
72"
48"
(105,4 cm)
24"
(61 cm)
(182,9 cm)
(243,8 cm)
(296,5 cm)
(304,8 cm)
(204,8 cm)
(182,9 cm)
(121,9 cm)
48"
(121,9 cm)
48"
(121,9 cm)
19
3" (7,6 cm)
GVC
TM
SP
EMA
PARTS REQUIRED:
FRONT WALL FRAME
x40
Fig. C
Narrow edge up.
1-1/2"
(3,8 cm)
SEAM
Arrange parts on edge on fl at surface. Measure and mark.
Ensure profi le angle of (2) top plates
GVC
and
EMA
are with the narrow edge up
(Fig. C)
.
Secure parts with (2) 3" nails at each mark and (4) 3" nails at seams.
3"
(7,6 cm)
Nails
GVC
3"
(7,6 cm)
Nails
XMB
x6
RAC
Flush
Flush
Flush
Flush
Secure
XMB
to Hasp Block
RAC
with (1) 3" screw.
Pre-drill screw hole.
Your front wall frame is now assembled.
FINISH
x1
GVC
2 x 4 x 72" (5,1 x 10,2 x 182,9)
x6
XMB
2 x 4 x 80-5/8" (5,1 x 10,2 x 204,8 cm)
x1
EMA
2 x 4 x 48" (5,1 x 10,2 x 121,9 cm)
Beveled
Profi le
Beveled
Profi le
x1
TM
2 x 4 x 72" (5,1 x 10,2 x 182,9 cm)
3" (7,6 cm)
x1
7
3"
(7,6 cm)
Screw
SEAM