25
BACK WALL INSTALLATION
PARTS REQUIRED:
Secure lower edge of panels to fl oor frame
with 1-1/2" nails spaced 6" apart.
Angle nails into the fl oor frame
(Fig. A)
.
2
Secure bottom plates to fl oor with 3" nails.
3
3"
(7,6 cm)
Screws x2
BEGIN
1
3" (7,6 cm)
x2
MJC
3"
(7,6 cm)
Nails
Center back wall on the fl oor.
The 3-1/2" measurement is at the top.
Install
MJC
as a temporary brace.
Secure with (2) 3" screws.
Flush
3-1/2"
(8,9 cm)
3" (7,6 cm)
x10
DOOR
DOOR
6"
(15,2 cm)
x1
MJC
2 x 4 x 53-1/2" (5,1 x 10,2 x 135,9 cm)
TEMPORARY SUPPORT
LEVEL
(Plumb)
x23
2" (5,1 cm)
Nail 2"
nails fi rst.
2"
(5,1 cm)
Nails
3"
(7,6 cm)
Nails
Fig. A