28
PARTS REQUIRED
3" (7,6 cm)
x2
2" (5,1 cm)
x6
LEFT WALL INSTALLATION
2"
(5,1 cm)
Screws
1-1/2"
(3,8 cm)
Nails
Fig. A
Nail 2" nails fi rst.
2"
(5,1 cm)
Nails
2
Secure lower edge of wall panels to fl oor
with (6) 2" nails spaced evenly.
Angle nails into the fl oor frame
(Fig. A)
.
ENSURE PANEL CORNERS ARE FLUSH.
ENSURE 31-5/16"
(79,5 cm)
MEASUREMENT
BETWEEN DOOR STUDS.
Flush
Flush
Working inside, secure door studs to fl oor
with (2) 3" screws.
Angle screws as shown
(Fig. A)
.
Secure left wall panels to front and back
corner studs with 1-1/2" nails spaced 6" apart.
4
3
Center left wall on the fl oor.
Flush wall panel to front and back
panel edges.
Secure wall with 2" screws to front and
back wall bottom and top plates.
Secure wall to bottom plate fi rst.
BEGIN
1
1-1/2" (3,8 cm)
x33
6"
(15,2 cm)
2" (5,1 cm)
x4
3"
(7,6 cm
Screw
2"
(5,1 cm)
Nails
Your walls are now installed.
Remove temporary supports.
FINISH
MAINTAIN
31-5/16"
(79,5 cm)
3"
(7,6 cm)
Screws