35
Install all trim with the primed side facing out.
Install
3-11/16" x 73-7/8"
and
3-11/16" x 73-7/8"
soffi t trim fl ush to
front wall panels and fl ush to rafter.
Begin installing at seam (Fig. A).
Secure with (2) 2" fi nishing nails in each rafter and (4) nails at seam.
Install
1-1/2" x 49-1/2"
soffi t trim to right side outer rafter.
Flush trim to installed trim.
Secure with 2" fi nishing nails spaced equally.
Repeat step 2 to install
1-1/2" x 49-1/2"
soffi t on left side.
1
2
BEGIN
3-11/16" x 73-7/8"
1-1/2" x 49-1/2"
3-11/16" x 49-7/8"
Your soffi t trim is now installed.
FINISH
PARTS REQUIRED:
SOFFIT TRIM
Flush
at seam
x28
2" (5,1 cm)
2"
(5,1 cm)
Finishing
Nails
2"
(5,1 cm)
Finishing
Nails
x1
3/8" x 3-11/16 x 73-7/8" (1 x 9,4 x 187,6 cm)
x1
3/8" x 3-11/16 x 49-7/8" (1 x 9,4 x 126,7 cm)
x2
3/8" x 1-1/2" x 49-1/2" (1 x 3,8 x 125,7 cm)
Flush
to panel
Flush
to panel
Flush
to panel
Flush
BEGIN HERE
Fig. A
Flush