3
COMPLETING YOUR SHED
You will need these additional materials:
OPTIONAL MATERIALS
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS NEEDED
DRIP EDGE ..................... 30 Feet
#15 ROOFING FELT
To cover 42 Sq. Ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 Lb
For roofing felt.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS
FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
• This shed kit includes a complete wood floor frame system.
• This shed kit does not include ANY leveling materials.
•
See the FLOOR LEVELING section on page 9 for recommended methods and suggested materials to properly level your
foor, as this will vary depending on your specific site.
3-TAB SHINGLES ........................... 2 Bundles
PAINT FOR SIDING ......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................. 1 Tube
Use acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 2 Lbs
For shingles.
PAINT FOR TRIM .............................1 Quart
Use 100% acrylic latex exterior paint.
WOOD GLUE ....................... Exterior Rated
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT!
The included floor is designed for general use. Depending on your specific use you may want to construct a heavy duty
floor frame by adding an additional floor joist (shown below as shaded). Below is a list of additional materials (not included):
x4
x1
2 x 4 x 8' (5 x 10 x 244 cm) Treated Lumber
Cut lumber to 2 x 4 x 45" (5 x 10 x 114,3 cm)
3" (7,6 cm) Hot Dipped Galvanized Nails
Optional 12" (30,5 cm) spacing
Standard 16" (40,6 cm) spacing