52
3
• You will finish off the top of the roof with a ridge cap made from shingles.
SHINGLES - RIDGE CAP
Note: • You will need about 24-26 cut pieces.
Cut shingles into THREE pieces. Hint: Use cut-off pieces first.
Score shingle,
then snap-off angled cut.
Install first ridge cap flush to shingles at front, as shown.
Install second ridge cap 5" back, as shown.
2
BEGIN
1
2"
(5,1 cm)
2"
(5,1 cm)
2"
(5,1 cm)
2"
(5,1 cm)
2"
(5,1 cm)
2"
(5,1 cm)
Top of slot.
Weather Seal
Flush
(1) Nail per side through weather seal.
(1) Nail per side through weather seal.
5"
(12,7 cm)
FRONT OF
SHED
Flush
24 to 26
Pieces