1-3/4"
(4,4 cm)
1-3/4"
(4,4 cm)
3/4"
(1,9 cm)
3-1/2"
(8,9 cm)
6"
(15,2 cm)
6"
(15,2 cm)
XWA
Primed side UP
28
Place
RIGHT
gable panel primed side up, centered on
XWA
with a 3/4"
overhang on bottom. Nail using five 1-1/2" nails, 6" apart.
Place
LEFT
gable panel primed side up, flush to right panel on
XWA
with a 3/4"
overhang on bottom. Nail using five 1-1/2" Nails, 6" apart.
Place
XWA
on flat on floor. Use
WX
as temporary supports as shown.
2
3
You have finished building your back wall gable panels.
FINISH
4
BEGIN
1
BACK WALL GABLE PANELS
PARTS REQUIRED:
x1
x1
x10
1-1/2" (3,8 cm)
XWA
WX
WX
x1
x2
2 x 4 x 23-7/8" (5,1 x 10,2 x 60,6 cm)
WX
2 x 3 x 55-3/4" (5,1 x 7,6 x 141,6 cm)