24-1/2"
(62,2 cm)
24-1/2"
(62,2 cm)
24"
(61 cm)
24"
(61 cm)
36
ROOF PANELS
Keep spacing between the center of
the rafters at the lower edge of the
panel and secure with one 2" nail into
each rafter
(Fig. E)
.
Move to the top of the panel and keep
spacing between the center of the
rafters. Secure with one 2" nail into
each rafter
(Fig. E)
.
Nail the roof panel using 2" nails 6"
apart on edges and 12" apart inside
panel
(Fig. F)
.
3
Attach the lower roof panel flush to
the upper panels and with a 1/2"
measurement at the gable trim
(Fig.G)
.
Nail the roof panel using 2" nails 6" apart
on edges and 12" apart inside panel.
Repeat process to attach roof
panels on the opposite side.
4
12"
(30,5 cm)
6" (15,2 cm)
Fig. F
7-7/8"
(20 cm)
96"
(243,8 cm)
1/2"
(1,3 cm)
Gable Trim
Flush
Fig. G
PARTS REQUIRED:
2" (5,1 cm)
x86
Fig. E
NOTE:
Measurements from outside of gable trim.
2" Nail
x2
7/16 x 7-7/8" x 96"
(1,1 x 20 x 243,8 cm)
FINISH
5
You have finished installing
your roof panels.