background image

22

FRONT WALL FRAME

PARTS REQUIRED:

2 x 4 x 64" (5 x 10 x 162,5 cm) 

UX

x1

2 x 3 x 9" (5 x 7,6 x 23 cm)

x1

NA

1 x 3 x 12" (2,5 x 7,6 x 30,5 cm)

x1

DI

32"

(77,5 cm)

32"

(77,5 cm)

32"

(77,5 cm)

32"

(77,5 cm)

DOOR 

2" (5 cm) x6

Orient 

NA

 and 

UX

 on  at on  oor as shown. 

Orient 

DI

 on  at on top of 

NA

  ush to top

 (Fig A.)

2

1

BEGIN

UX

NA

DI

Flush to TOP

Fig. A

Flush

2-1/2"

(6,3 cm)

Nail 

DI

 to 

NA

 and 

UX

 using (6) 2" nails as shown.

3

2-1/2"

(6,3 cm)

3-1/2"

(8,9 cm)

Summary of Contents for Handy Home MAJESTIC 8' x 12'

Page 1: ... NN ...

Page 2: ... 4HIS PAGE INTENTIONALLY LEFT BLANK ...

Page 3: ...efore building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 8 CHECK ALL PARTS Inventory all parts listed on pages 4 6 Contact our Customer Service Team if any parts are miss...

Page 4: ...r installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Caulk Gun Hammer L...

Page 5: ... paintable 1 GALVANIZED ROOFING NAILS 3 Lbs For shingles PAINT FOR TRIM 1 Quart Use 100 acrylic latex exterior paint WOOD GLUE Exterior Rated REINFORCED WOOD FLOOR FRAME OPTIONAL IMPORTANT c use you may want to construct a oor joists shown below as shaded Below is a list of additional materials not included x6 x24 2 x 4 x 8 5 x 10 x 244 cm Treated Lumber Cut to 6 2 x 4 x 93 5 x 10 x 236 cm ea 3 7 ...

Page 6: ... 122 cm NK x1 2 x 3 x 23 5 x 7 6 x 58 cm FR x1 2 x 4 x 64 5 x 10 x 162 5 cm UX x1 1 x 3 x 12 2 5 x 7 6 x 30 5 cm DI x2 2 x 3 x 35 1 4 5 x 7 6 x 89 5 cm FS PARTS LIST INVENTORY YOUR PARTS before you begin We suggest sorting parts by the category they are listed in RAFTERS x3 JF 1 x 4 x 60 2 5 x 10 x 152 cm x10 6 x 23 1 4 15 x 59 cm TRIM ZJ x2 5 8 x 2 1 2 x 72 1 6 x 6 3 x 183 cm AW x2 2 x 3 x 41 7 8...

Page 7: ...OW NOTE Panel parts are not stamped Shelf panels are 7 16 1 1 cm thick Roof panels are 7 16 1 1 cm thick 7 16 x 23 7 8 x 91 1 1 x 61 x 231 cm 7 16 x 44 1 4 x 48 1 1 x 112 x 122 cm x1 7 16 x 25 3 4 x 48 1 1 x 65 4 x 122 cm x4 x2 7 16 x 11 1 4 x 25 3 4 1 1 x 29 x 65 4 cm x4 7 16 x 11 1 4 x 96 1 1 x 29 x 244 cm x2 7 16 x 11 7 8 x 96 1 1 x 30 x 244 cm x2 7 16 x 48 x 96 1 1 x 122 x 244 cm x2 x2 10 1 2 ...

Page 8: ...x1 x1 x1 x2 x2 x1 LEFT DOOR x1 RIGHT DOOR x110 113 x70 x96 x64 x20 x48 DOOR HARDWARE Not Actual Size FASTENER HARDWARE BAG Shown Actual Size 6 1 1 4 3 2 cm 1 1 4 3 2 cm 2 5 0 cm 3 7 6 cm 3 4 1 9 cm 2 5 0 cm 1 1 2 3 8 cm x1 x2 x2 1 2 5 cm 1 1 4 3 2 cm x2 x6 3 4 1 9 cm ...

Page 9: ...els and nails to complete your oor Floor panel sizes and quantities are shown below NOTE Use a minimum of 5 8 1 6 cm oriented strand board OSB x1 1 lb of 2 5 0 cm Hot Dipped Galvanized Box Type Nails 2 5 0 cm NOTES x3 5 8 x 48 x 96 1 6 x 122 x 244 cm ...

Page 10: ...or best results and aiding in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQUIRED x2 4 x 4 x 12 10 x 10 x 366 cm Treated Lumber Fasteners for Frame to 4 x 4 3 Screws shown as one option Minimum 28 3 screws exterior grade Use only wood treated for ground contact and fasteners ap...

Page 11: ... high quality exterior grade caulk beneath all sill plates Fasten 2 x 4 5 x 10 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Treated Sill Plate Caulk between sill plate and concrete Allow new concrete slabs to cure for at least seven 7 days 2 x 4 x 12 5 x 10 x 366 cm 2 x 4 x 8 5 x 10 x 244 cm Caulk Requires...

Page 12: ... x 4 x 96 5 x 10 x 244 cm 2 x 4 x 93 5 x 10 x 236 cm x2 2 x 4 x 48 5 x 10 x 122 cm PARTS REQUIRED Center on marks FLOOR FRAME Flush Flush Look for Stamp TREATED HINT For easier nailing stand on frame 2 1 Use two 3 nails at each mark Orient parts as shown on at surface Measure and mark BEGIN You have nished your oor frame Proceed to level and square frame FINISH 3 ...

Page 13: ...easurement will be approximately 173 1 16 440 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square Fig A Once the oor frame is level and square fasten the frame to the 4x4 runners a...

Page 14: ...to joists under panel Ensure your oor frame is square by installing one panel and squaring frame Fig A Fig B Fig C Check the oor frame is square by measuring diagonally across the frame corners If the measurements are the same your oor frame is square The measurement will be approximately 173 1 16 440 cm Fig C PARTS REQUIRED x1 5 8 x 48 x 96 1 6 x 122 x 244 cm Grid lines up 12 30 cm 2 5 cm x55 Flu...

Page 15: ...u have nished attaching your oor panels Continue installing panels with rough side up painted grid lines Use grid lines on panel for 2 nails 6 apart on edges and 12 apart inside panels 5 7 6 x2 5 8 x 48 x 96 1 6 x 122 x 244 cm Grid lines up 2 5 cm x110 FLOOR PANELS Flush Flush Flush ...

Page 16: ...Wall Check the oor frame is level after installing oor panels Re level if needed HINT IMPORTANT The oor should used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls ...

Page 17: ...7 NK PT PT NK x14 2 x 3 x 78 1 2 5 x 7 6 x 199 cm FU x4 2 x 3 x 96 5 x 7 6 x 244 cm PT x4 2 x 3 x 48 5 x 7 6 x 122 cm NK HINT For easier nailing stand on frame 15 3 7 6 cm x64 DOOR BEGIN 1 Use two 3 nails at each mark IMPORTANT You will build two walls the same Orient parts on edge on oor Measure and mark 2 TOENAILING Offset Seam Offset Seam ...

Page 18: ...o 2 nails in the corners Fig A Nail the panel using 2 nails 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with two 2 nails Fig B 4 5 3 3 4 GAUGE BLOCK 48 122 cm 3 4 1...

Page 19: ...hown with primed side facing up Nail using 2 nails 6 apart on edges and 12 apart inside panel 6 Place end 48 panel on frame as shown with primed side facing up Nail using 2 nails 6 apart on edges and 12 apart inside panel 7 You have nished building both your sidewalls FINISH 9 Primed side up Primed side up SIDE WALL PANELS 48 x 84 122 x 213 cm PARTS REQUIRED x2 2 5 cm x90 2 x 3 x 13 5 x 7 6 x 33 c...

Page 20: ...3 cm x1 PS x2 x1 FS 48 x 96 122 x 244 cm x1 DOOR RK 3 2 4 Nail FS rst 1 2 5 cm from panel bottom Use 1 1 2 nails only 6 15 cm apart Place PS ush to FS Hold the 36 1 4 92 cm measurement and nail with 1 1 2 nails 12 30 cm apart Place panel on FS and PS with primed side up Orient parts on at on oor as shown PS temporary support PS FS Primed side UP Use only 1 1 2 3 8 cm long nails RK temporary suppor...

Page 21: ...5 8 x 3 x 9 1 6 x 7 6 x 23 cm EY TEMPORARY SUPPORT Place PS ush to FS Hold the 74 5 8 189 5 cm measurement and nail with 1 1 2 3 8 cm nails 12 30 cm apart Orient parts on at beneath panel as shown Orient AQ on at and beneath panel as shown PS PS FS AQ RK temporary support 7 5 Place the EY 5 8 1 6 cm spacer on the lower PS Place FS ush to spacer and nail Use 1 1 2 3 8 cm nails only 6 15 cm apart 6 ...

Page 22: ...3 8 cm x26 BACK WALL PARTS REQUIRED 2 x 3 x 13 5 x 7 6 x 33 cm x1 RK x1 DOOR 48 x 96 122 x 244 cm Flush Flush 11 10 Nail using 1 1 2 nails 6 15 cm apart on edges and 12 apart inside panel Place right panel onto frame primed side up Primed side UP RK temporary support ...

Page 23: ... x 24 1 x 30 5 x 61 cm x1 3 8 x 12 x 24 1 x 30 5 x 61 cm 1 1 2 3 8 cm x12 13 12 Nail RK on edge at each location using three 1 1 2 nails Fig A Nail left and right 12 x 24 30 5 x 61 cm panels primed side up using three 1 1 2 nails You have nished your back wall FINISH 14 RK Primed side UP 1 2 5 cm 2 1 2 6 4 cm Fig A RK RK Line up seams ...

Page 24: ...3 x 12 2 5 x 7 6 x 30 5 cm x1 DI 32 77 5 cm 32 77 5 cm 32 77 5 cm 32 77 5 cm DOOR 2 5 cm x6 Orient NA and UX on at on oor as shown Orient DI on at on top of NA ush to top Fig A 2 1 BEGIN UX NA DI Flush to TOP Fig A Flush 2 1 2 6 3 cm Nail DI to NA and UX using 6 2 nails as shown 3 2 1 2 6 3 cm 3 1 2 8 9 cm ...

Page 25: ...e Assembled Frame on at DI facing down Position Frame 9 from bottom of FW Install Frame to studs using 2 3 nails Fig B 2 3 1 BEGIN FW 1 1 2 3 2 cm 1 1 2 3 2 cm 1 1 2 3 2 cm FV FV 9 23 cm 10 23 cm 10 23 cm 84 213 cm 64 162 5 cm 9 23 cm 2 3 10 cm Nails 2 3 10 cm Nails Pre Assembled Pre Assembled 3 1 2 9 cm 3 1 2 9 cm 3 1 2 9 cm 2 1 2 6 3 cm Fig A Fig B Flush 82 1 2 210 cm Temporary Support Temporary...

Page 26: ... until after front panels are installed 4 5 3 7 6 cm x2 3 7 6 cm x2 FRONT WALL FRAME PARTS REQUIRED 2 x 3 x 23 5 x 7 6 x 58 cm x1 FR DOOR Temporary Support 7 16 x 25 3 4 x 48 1 1 x 65 4 x 122 cm x3 You have nished your front wall frame FINISH 6 Flush Flush Temporary Support NA FR Fig B Fig A 42 106 7 cm 42 106 7 cm 2 1 2 6 3 cm 2 1 2 6 3 cm 2 3 10 cm Screws 2 3 10 cm Nails ...

Page 27: ...m Temporary Supports x1 DOOR HANDLE WITH CARE TO PREVENT BREAKING AT CORNERS 6 15 cm Place left panel on front wall frame with primed side up as shown 2 Nail with 1 1 2 nails 6 15 cm apart Maintain 64 162 5 cm measurement between studs and square frame Primed side UP BEGIN 1 Hold the 1 1 4 and 1 4 measurement Handle panels with care to avoid breakage 3 1 2 9 cm 1 1 4 3 2 cm ...

Page 28: ...s on front wall frame with primed side up as shown Nail with 1 1 2 nails 6 15 cm apart 4 Nail with 1 1 2 nails 6 15 cm apart Maintain 64 162 5 cm measurement between studs and square frame 64 162 5 cm MAINTAIN MEASUREMENT BETWEEN STUDS Flush Flush HANDLE WITH CARE TO PREVENT BREAKING AT CORNERS Temporary Supports You have nished your front wall FINISH 6 1 4 0 6 cm BELOW PANEL 12 30 5 cm 6 15 cm Pr...

Page 29: ...wo 3 screws 2 BEGIN 1 First nail lower edge of panel to oor frame using 2 nails 6 apart Angle nail to hit oor frame Fig A 3 You have nished standing your back wall FINISH 6 Nail 2 nails rst Angle to nail into oor frame 3 7 6 cm Nail 2 5 cm Nail Fig A 3 7 6 cm Screw Fig B Attach RK using three 3 7 6 cm nails as shown Angle nails to hit oor frame Fig A Secure back wall upright to oor using two 3 scr...

Page 30: ...l edge into the sidewall stud using 2 nails spaced 6 apart Nail along bottom of panel using 2 nails 6 apart Angle nail to hit oor frame Fig C Stand right sidewall on oor It is important to secure the sidewall in the following order 3 7 6 cm Nail Center sidewall on oor front to back Nail the lower backwall corner to the sidewall frame with one 2 nail Fig A 1 CENTER DOOR Fig A 2 5 cm Nail 6 15 cm Fi...

Page 31: ...NT You have nished standing your front wall FINISH 4 29 3 7 6 cm x2 FRONT WALL INSTALLATION 2 5 cm x30 3 7 6 cm x4 2 Be sure the measurement between the panel edges is the same along the entire length Then secure with one 2 nail in the upper corner Fig C Nail along the panel edge into the sidewall stud using 2 nails spaced 6 apart Secure the frontwall frame using two 3 screws Fig D Repeat process ...

Page 32: ... Measure the top of back wall loft support to oor Measure and mark the same measurement on the back side of sidewall studs at each side as shown Install one TP level against back side of studs at mark with two 3 nails at each end 2 1 BEGIN 3 Repeat steps 1 2 to install second TP You have nished installing your loft frame FINISH 4 DOOR ...

Page 33: ...T SIDE WALL DOOR Loft Support Flush Place PT ush to top of loft support as shown Fig A Install PT level against studs and with top edge of loft support Secure PT with two 3 nails at each stud and at door side with two 3 screws 2 1 BEGIN DOOR 3 7 6 cm Nails 2 3 7 6 cm Screws at end only Flush at top of loft support Fig A 2 3 7 6 cm Nails ...

Page 34: ... Support NOTE There will be a gap at the end of PT Fig A Front Wall Support You have nished installing your left side shelf frame Repeat steps 1 through 4 on right side for second shelf frame FINISH 5 Place PT against loft support Fig A and secure ush using two 3 screws Check PT for level and secure at front wall with two 3 screws 3 4 DOOR Assistance may be required to install PT ...

Page 35: ...f back wall workbench support from oor Measure and mark the same measurement on the back side of sidewall studs at each side as shown Install PT level against back side of studs at mark with two 3 nails at each end 2 1 BEGIN FLOOR PT SAME MEASUREMENT Workbench Support Mark stud Mark stud DOOR ...

Page 36: ...nished installing your workbench FINISH 5 Place workbench into gap in back wall upright Secure with 2 nails as shown 23 7 8 61 cm Fit panel into gap Attach FQ to upright and workbench using four 3 7 6 cm screws as shown Fig A FQ Fig A Angle top screw to hit FQ Angle bottom screw so it does not protrude past panel 4 3 7 6 cm Screws Flush DOOR ...

Page 37: ... cm x8 7 16 x 44 1 4 x 48 1 1 x 112 x 122 cm x2 DOOR Place loft panels onto the three loft supports centered from side to side and ush with the back wall panel Fit panels into gap IMPORTANT Use only FOUR 2 nails in each panel to allow squaring the roof You will complete nailing the loft panels later FINISH 3 2 BEGIN 1 You have temporarily nished your loft panels ...

Page 38: ...nto the left wall shelf frame Shelf panel should be ush against shelf support and loft panel Attach using 2 nails as shown Repeat on opposite side FINISH 3 BEGIN 1 You have nished installing your shelf panels 2 DOOR Attention Load not to exceed 100 lbs evenly distributed across shelf Attention Load not to exceed 250 lbs evenly distributed across loft ...

Page 39: ...support 2x3 96 244 cm Touch at peak Repeat steps 1 4 to build four more assemblies 5 Flip over rafter assembly and glue and nail second gusset to back side 4 Nail gusset onto rafter using 2 nails staggered as shown BEGIN 1 Rafters should touch at peak Apply glue on gusset and place on rafters 2 You will build FIVE assemblies Place two rafter halves in the corner of back and side walls FINISH 6 You...

Page 40: ... 4 Repeat steps to attach 4 rafters First secure ends of rafters with one 2 screw at each end Fig A Secure ends of rafters with two 3 screw at each end Fig B Fig C You have attached your rafters 3 2 BEGIN 1 Align over studs Maintain the measurements between rafters Fig B Fig C Fig A Locate rafters directly over studs and ush to wall panel Check that you have the measurements shown 2 3 7 6 cm Screw...

Page 41: ...x64 Trim is ush with top of side wall panel Install metal corner trim ush with top of side panel Fig A Secure trim to wall using sixteen 1 1 4 nails eight per side spaced evenly as shown 2 BEGIN 1 You have nished installing your corner trim FINISH 3 DOOR Flush Fig A ...

Page 42: ... x 4 x 59 1 8 5 x 10 x 150 2 cm PARTS REQUIRED OO x1 2 x 3 x 69 5 x 7 6 x 175 3 cm Temporary Straight Edge Mark Line OO 1 1 4 3 2 cm 1 1 4 3 2 cm 1 1 4 3 2 cm Orient AG on floor as shown Using OO as a straight edge mark a line 1 1 4 3 2 cm down length of AG Fig A Fig A ...

Page 43: ... A Attach trim with seven 1 1 4 screws from inside Install two screws at seam Fig B Repeat steps 3 4 to attach the back trim You have attached your upper trim 4 3 5 DOOR AG x4 2 x 4 x 59 1 8 5 x 10 x 150 cm PARTS REQUIRED Line up seams Pre marked Line AG AG 7 1 8 cm A p p ro xim a te ly Fig A Fig B Flush NOTE Upper gable panels may be slightly offset from lower panels If this occurs mark a line on...

Page 44: ... GABLE TRIM 1 1 4 3 2 cm x24 FINISH 3 BEGIN Install AW level over seam of front wall panels with twelve 1 1 4 screws from inside as shown Repeat step 1 installing AW over seam at back side 2 1 You have nished installing your horizontal gable trim DOOR AW AW ...

Page 45: ...only known as racking Roof panels may cause serious injury until securely fastened Attach the 48 x 96 panel with the rough side up painted grid lines side with a 3 4 measurement on the rafter Fig A and the panel ush at the peak Fig B Secure panel with two 2 nails in the corners 1 BEGIN 2 5 cm x4 PARTS REQUIRED ROOF PANELS 3 4 GAUGE BLOCK GAA 7 16 x 11 1 4 x 96 1 1 x 28 6 x 244 cm x2 7 16 x 48 x 96...

Page 46: ...Nail the roof panel using 2 nails 6 apart Attach one upper 11 1 4 x 25 3 4 roof panel ush to the installed panel Fig G and ush at peak Fig H and with 1 8 at gable trim Fig J Nail the roof panels using 2 nails 6 apart Move to opposite end to install two more panels Repeat process to attach roof panels on the opposite side You have nished installing your roof panels 4 5 PARTS REQUIRED ROOF PANELS 3 ...

Page 47: ...S 2 5 cm x18 FINISH 3 2 1 BEGIN Position and level each JF on rst three rafters past door opening Do not install JF over loft HINT For best appearance install JF on rafter facing away from door opening Glue JF and attach with 2 nails as shown You have nished installiing your collar ties DOOR ...

Page 48: ...46 Attention Load not to exceed 250 lbs evenly distributed across loft LOFT PANELS 2 5 cm x22 Continue nailing 2 nails in each loft panel as shown FINISH 2 BEGIN 1 You have nished your loft panels DOOR ...

Page 49: ... 10 x 244 cm TP x2 2 x 4 x 48 3 4 5 x 10 x 124 cm AN DOOR 1 1 4 3 2 cm x40 BEGIN 1 FINISH 4 Attach sof t trim ush to sidewall panels and under roof panels Fig A using 1 1 4 screws as shown Repeat step 1 2 to attach sof t trim on opposite side Secure ends of TP and AN with 2 3 screws through gable trim Fig A You have attached your sof t trim 3 2 Fig A 3 7 6 cm x 8 ...

Page 50: ... 24 61 cm 24 61 cm 24 61 cm PARTS REQUIRED BATTENS DOOR BEGIN 1 FINISH 3 Install top of battens positioned against TP and AN on side wall panels Fig A using 2 nails as shown Evenly space battens 24 apart covering any seams on panels Repeat steps to attach battens on opposite side You have installed your battens 2 Fig A ...

Page 51: ... Attach temporary support GAA at bottom with 1 1 4 screws Tighten securely DOOR HINT Look for 3 8 SPACER attached to doors GAA OO Make sure spacer is attached Tighten screws securely OFFSET 4 3 7 6 cm Screws Screws 1 1 4 3 cm Bottom edges ush NOTE Screw hole will be used later 3 8 1 cm 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED 3 7 6 cm x4 OO x1 GAA x1 1 x 3 x 5 2 5 x 7 6 x 12 7 cm 2 x 3 x 69 5 x...

Page 52: ...orts and check doors open properly 7 FINISH 8 You have nished installing your doors Screw hinge boards into wall supports and oor using ten 3 screws as shown Make sure screws go into framing and oor Fig C D 6 3 7 6 cm Screws into the wall support and oor frame Fig B SEAM Fig C 3 8 1 cm Fig D Angle 3 7 6 cm Screw Attach temporary support OO as a ledger board ush under wall panels for doors to rest ...

Page 53: ...ENTER Reinforce the door trim using 3 4 screws through door panel into trim Fig A Locate screws as shown in Fig B Use two screws at seams 3 4 1 9 cm x38 Fig B Two Screws Door Trim Fig A Door Panel Install 3 4 screws from inside No screws in this area of RIGHT DOOR Door hardware will be installed here later ...

Page 54: ... BEGIN 1 Apply high quality exterior grade caulk to seal window From outside of shed position windows in opening and level Use 2 screws at top of windows Do not fully tighten screws Adjust gap between windows to approximately 1 2 1 1 4 3 2 cm x4 HINT Caulk behind frame near edge before installing 2 ...

Page 55: ... Flush Flush CENTER Do not nail into window ange Inside Framing Mark Center PARTS REQUIRED WINDOWS Do not nail into window ange HINT Mark edge of window frame on ZJ ZJ DOOR 3 Center ZJ over doors and secure using fourteen 2 nish nails into framing as shown Mark ...

Page 56: ...ll three EY using 2 nails into framing as shown NOTE Use marks on ZJ for locating window ange Do not nail into window ange Remove temporary screws after installiing three EY DOOR Mark 2 Nails from outside EY x3 CAUTION Do not nail into window ange Flush Keep aligned Keep aligned Flush Mark ...

Page 57: ...NDOWS Install 3 4 1 9 cm screws from inside 3 4 1 9 cm x10 6 7 Install ZJ centered over windows using seven 2 nish nails into framing Do not nail into window ange From inside install 3 4 screws into ZJ and outer two EY Do not screw into window ange You have nished installing your windows CAUTION Do not screw into window ange INSIDE OF SHED FINISH 8 DOOR ...

Page 58: ... x 7 6 x 175 cm x2 2 5 cm x14 DOOR WEATHERSTRIP OO FINISH 5 On right door center OO vertically in door opening Fig A OO will offset the right door 1 IN from the door trim Fig C 3 Secure OO using seven 3 screws through outside trim into OO Fig C 4 DOOR OO Screws 2 5 cm x14 1 2 5 cm OFFSET Screws 2 5 cm 1 2 5 cm OFFSET Secure OO using seven 3 screws through outside trim into OO Fig B 2 Fig A Fig B F...

Page 59: ... ush at top of OO on left door using 3 4 screws as shown Fig A Mount the second barrel bolt ush at bottom of OO on left door using 3 4 screws as shown Fig B 1 OO OO Fig A Fig B Flush on OO Flush on OO Drill 3 8 hole in line with bolt LEFT DOOR HINT With door closed extend bolt and tap with hammer to leave a mark in wood for drilling 57 PARTS REQUIRED DOOR 3 4 1 9 cm x12 x2 You have nished installi...

Page 60: ...2 cm x2 Re drill hole with 1 2 drill Fig B Keep drilled hole square to trim to avoid breaking edge of 2x3 Secure backplate with 1 screws and handle with 1 1 4 screws as shown You have nished installing your door handle FINISH 4 BEGIN 1 2 3 Measure and mark location of hole on outside of right door as shown Fig A Pre drill hole with 1 4 drill DOOR Fig A Fig B 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit ...

Page 61: ...ng Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Install felt ush to all roof edges overlapping 3 Use minimal amount of roo ng nails to hold in place OK to overlap at ridge 3 OVERLAP Flush Flush Edge ush to trim Install dri...

Page 62: ...across with lower edge of roof deck NOTE If you have installed drip edge install shingles ush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhang or ush with drip edge 4 Nails BACK OF SHED FRONT OF SHED NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS Familiarize yourself with a 3 Tab Shingle SHINGLE NAIL PATTERN 1 2 5 cm NAILS Sealing St...

Page 63: ... Roof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles ush at top of rst row s rain slots Ensure 1 overhang or ush to drip edge at front stagger each row 3 1 2 5 cm 1 2 5 cm FRONT OF SHED FRONT OF SHED Flush with rain slots Flush with rain slots Notch Notch ...

Page 64: ...t ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut shingles along chalk line 5 6 7 8 SHINGLES continued If more than 5 to rain slot you must install another row of shingles 5 12 7 cm or less 5 12 7 c...

Page 65: ...se cut off pieces rst Score shingle then snap off angled cut Install rst ridge cap ush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm 2 5 cm Top of slot Weather Seal Flush 1 Nail per side through weather seal 1 Nail per side through weather seal 5 12 7 cm FRONT OF SHED FRONT OF SHED Flush 28 to 30 Pieces ...

Page 66: ...is 4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install ush to shingles 4 5 6 7 2 Nails per side You have nished your ridge cap FINISH 8 Cut at top of rain slot Flush to shingles Trim cap off ush to shingles Cap 4 10 cm ...

Page 67: ...nt and seal all exposed edges sides and faces of SmartSide and waferboard siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas Timber Buildings To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or timber building with an exteri...

Reviews: