33
3" (7,6 cm)
Nail gable panels to front wall panels and
LW
using 2" nails 6" apart.
Screw
DQ
to top plate using (2) 3" screws
(Fig. A)
.
Place gable assembly centered
on front wall top plate overlapping front wall panels.
2
3
You have fi nished installing your front wall gable panels.
FINISH
BEGIN
1
FRONT WALL GABLE PANELS
PARTS REQUIRED:
2" (5,1 cm)
Nails
2" (5,1 cm)
Nails
2" (5,1 cm)
Nails
Flush
Center gable panel assembly on mark.
LEVEL
LEVEL
2" (5,1 cm)
x18
(2) 3" (7,6 cm)
Screws
(2) 3" (7,6 cm)
Screws
Fig. A
x2
LW
6"
(15,2 cm)
PRE-ASSEMBLED
DQ