4
COMPLETING YOUR SHED
You will need these additional materials:
OPTIONAL MATERIALS
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
DRIP EDGE ..................... 60 Feet
#15 ROOFING FELT
To cover 93 Sq. Ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 Lb
For roofing felt.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS
FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TAB SHINGLES ............................ 6 Bundles
PAINT FOR SIDING .......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................. 2 Tubes
Use acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 3 Lbs
For shingles.
PAINT FOR TRIM .............................2 Quart
Use 100% acrylic latex exterior paint.
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT!
The included floor has been designed for general use. Depending on your specific use you may want to construct a
heavy duty floor frame by adding additional floor joists (shown below as shaded). Below is a list of additional materials (not included):
x5
x20
2 x 4 x 8' (5 x 10 x 244 cm) Treated Lumber
Cut to (6) 2 x 4 x 93" (5 x 10 x 236 cm)
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
• This shed kit includes a complete wood floor system.
• This shed kit does not include ANY leveling materials.
•
See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your
floor, as this will vary depending on your specific site.
Optional 12" (30,5 cm) spacing
Standard 24" (61 cm) spacing