background image

22

2-1/2"  

(6,4 cm)

2-1/2"  

(6,4 cm)

MAINTAIN DIMENSION BETWEEN STUDS

6"

(15,2 cm)

6"

(15,2 cm)

Your front wall is now complete.

FINISH

Place left panel on front wall frame, as shown  

Ensure panel has a 1" gap at bottom and is flush to inside edge. 

 

Secure with 2" nails spaced 6" apart. 

Repeat steps to install right panel.

BEGIN

1

2

FRONT WALL PANELS

PARTS REQUIRED:

2" (5,1 cm)

x32

3/8 x 23-7/8 x 72"
(1 x 60,6 x 182,9 cm)

x2

48-1/2"

(123,2 cm)

Panels will overhang frame 
approx. 3/16" (4,8 mm).

Install all wall panels with the primed side up.

1"

(2,5 cm)

1"

(2,5 cm)

Flush

Flush

OO

x1

69" (175,3) Door Stiffener

Temporary Brace

3" (7,6 cm) 

x2

Install part 

OO

 as a temporary brace.  

Secure with with (2) 3" screws. 

OO 

Temporary Brace

3" 

(7,6 cm)

 

Screw

3" 

(7,6 cm)

 

Screw

Summary of Contents for shedmaster GABLE 8' x 12'

Page 1: ...shed JOIN OUR TEAM AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALL...

Page 2: ...BUILDING RESTRICTIONS AND APPROVALS Be sure to check local building department and homeowners association for specific restrictions and or requirements before building ENGINEERED DRAWINGS Contact our...

Page 3: ...Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember...

Page 4: ...treated lumber Use a high quality exterior grade caulk beneath all sill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code fo...

Page 5: ...OOD FLOOR FRAME OPTIONAL IMPORTANT The included floor has been designed for general use Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joi...

Page 6: ...1 x 7 6 x 86 4 cm x2 CI Part identification is stamped on some parts Check these locations for part stamp RS RS x1 2 x 3 x 91 5 1 x 7 6 x 231 1 cm PS DOOR FLOOR OO x1 69 175 3 Door Stiffener 2 x 4 x 9...

Page 7: ...8 cm x2 5 7 8 x 48 14 9 x 121 9 cm x1 DOOR ROOF PANELS x100 1 1 2 3 8 cm x7 3 4 1 9 cm NOTE If you are using a nail gun nails may be used where screws are shown for quicker assembly Length of nail mus...

Page 8: ...ound contact and fasteners approved for use with treated wood Always support frame seams Leveling higher than 16 not recommended LEVELING MATERIALS Gravel 2x4 Treated Lumber Solid Masonry Blocks in 1...

Page 9: ...r easier nailing stand on frame 1 Arrange parts as shown on flat surface Measure and mark Secure with 2 3 nails at each mark and 4 nails at seams Your floor frame is now finished Proceed to level and...

Page 10: ...agonal measurement will be approximately 170 1 4 432 4 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner At the opposite end o...

Page 11: ...3 4 Secure the panel with 2 nails spaced 6 apart on edges and 12 apart inside panel Use a chalk line or use pre painted grid lines to locate joists Ensure that the floor frame is square by measuring d...

Page 12: ...5 1 cm 5 PARTS REQUIRED x110 FINISH Your floor panels are now installed Install 2 48 x 96 panels flush to installed panels Install middle panel first Secure panels with 2 nails spaced 6 apart on edge...

Page 13: ...loor panels Re level if needed The floor should be used as a stable work surface for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls HIN...

Page 14: ...each mark and 4 3 nails at seams IMPORTANT You will build two walls the same 3 7 6 cm PARTS REQUIRED x32 2 5 1 cm x32 Center on marks x14 2 x 3 x 67 3 8 5 1 x 7 6 x 171 1 cm CJ HINT For easier nailing...

Page 15: ...anel with 2 nails spaced 6 apart on edges and 12 apart inside panel Install all wall panels with the primed side facing up Ensure your wall is square by installing one panel and squaring frame Move to...

Page 16: ...p plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel 3 Carefully flip your side wall over Repeat steps to assemble your second side wall Your 2 side walls are now finished FIN...

Page 17: ...6 x 86 4 cm x1 CI x1 2 x 3 x 91 5 1 x 7 6 x 231 1 cm PS BACK WALL FRAME 2 1 BEGIN 3 7 6 cm PARTS REQUIRED HINT x3 CI Flush PS 2 3 7 6 cm Nails Center PS on CI on edge on floor as shown Secure parts wi...

Page 18: ...ig B Center PT on CI on edge on floor as shown Secure PT to CI with 2 3 nails Fig A Center CI on PS on flat side Use 3 gussets stacked under CI as support 3 7 6 cm BACK WALL FRAME At the middle connec...

Page 19: ...ls 2 5 1 cm Nails 2 5 1 cm Nails x1 Place left panel on back frame as shown BEGIN 2 3 1 Secure horizontal framing with 2 nails spaced 6 apart on edges and 12 apart inside panel Secure vertical framing...

Page 20: ...installed panel and flush at top 5 6 4 BACK WALL PANELS PARTS REQUIRED FINISH Your back wall panels are now installed Secure horizontal framing with 2 nails spaced 6 apart on edges and 12 apart inside...

Page 21: ...5 1 x 7 6 x 33 cm RK Position RK on edge 2 1 2 from outside edge and 1 from bottom edge of left wall panel Fig A Secure RK to wall panel with 3 2 nails Fig B 1 Your back wall is now complete BEGIN FI...

Page 22: ...ge parts on edge on floor as shown Secure with 2 3 nails at each connection 1 BEGIN 3 7 6 cm PARTS REQUIRED HINT 2 x 3 x 96 5 1 x 7 6 x 243 8 cm x4 x1 PT x2 2 x 3 x 69 1 2 5 1 x 7 6 x 176 5 cm KU 96 2...

Page 23: ...d 6 apart Repeat steps to install right panel BEGIN 1 2 FRONT WALL PANELS PARTS REQUIRED 2 5 1 cm x32 3 8 x 23 7 8 x 72 1 x 60 6 x 182 9 cm x2 48 1 2 123 2 cm Panels will overhang frame approx 3 16 4...

Page 24: ...ATION PARTS REQUIRED OO 1 1 2 3 8 cm Secure lower edge of panels to floor frame with 2 nails spaced 6 apart Angle nails into the floor frame Fig A 2 Your right side wall is now installed FINISH Secure...

Page 25: ...s spaced 6 apart Secure back wall inside horizontal support to side wall stud with 2 3 screws Fig C 3 4 5 6 7 6 15 2 cm 6 15 2 cm D O O R D O O R 3 7 6 cm x8 2 5 1 cm x18 Center back gable wall on the...

Page 26: ...ils spaced 6 apart Angle nail into floor frame Fig A 2 ENSURE SIDE AND BACK PANELS ARE EQUALLY SPACED ALONG CORNER DOOR DOOR Equally Spaced 2 5 1 cm Screws Fit top plate over back wall 2 5 1 cm Nails...

Page 27: ...e front wall to side walls with 1 1 2 nails spaced 6 apart 3 Your walls are now installed FINISH 6 15 2 cm Secure front wall top plate to side walls with 2 3 nails Fig B Fig C Secure bottom of front w...

Page 28: ...a gusset to maintain 3 8 overhang as shown Secure with 2 nails spaced 6 apart BEGIN 1 FRONT WALL HEADER 2 5 1 cm PARTS REQUIRED x9 1 x 3 x 55 2 5 x 7 6 x 137 2 cm x1 DS DS DS Flush CENTER CENTER Use G...

Page 29: ...Flush at peak 2 PARTS REQUIRED 2 x 4 x 54 5 1 x 10 2 x 137 2 cm 6 x 24 15 2 x 61 cm x10 x10 x120 CM Place 2 rafter halves CM in corners of back wall You will assemble 5 rafters 96 243 8 cm Temporary S...

Page 30: ...ams Secure with with 1 2 screw through panel into end of rafter Fig A 1 FINISH Your rafters are now installed BEGIN 2 3 2 5 1 cm x14 2 5 1 cm Screw Fig A Maintain the measurements between rafters 3 7...

Page 31: ...n BV with a 1 overhang on bottom Secure with 4 1 1 2 nails Place BV on flat on floor 2 3 Your back gable unit is now assembled FINISH BEGIN 1 BACK GABLE UNIT PARTS REQUIRED 2 x 3 x 17 1 2 5 1 x 7 6 x...

Page 32: ...apart 2 Lift and set back gable unit on back wall top plate overlapping wall panels Working inside secure gable unit with 2 3 screws into BV angled into top plate Fig A Measure 1 2 5 cm down from top...

Page 33: ...n BV with a 3 4 overhang on bottom Secure with 4 1 3 4 Nails Place BV on flat on floor as shown 2 3 FINISH BEGIN 1 FRONT GABLE UNIT PARTS REQUIRED x1 x1 1 1 4 3 2 cm 1 1 4 3 2 cm 3 4 1 9 cm 3 4 1 9 cm...

Page 34: ...r front gable unit is now installed Continue nailing lower edge of panels to top plate doublers with 1 1 2 nails spaced 6 apart 2 Lift and set back gable unit on back wall top plate overlapping wall p...

Page 35: ...le panel Fig A Secure with 1 2 nail Repeat steps to install trim to all 4 corners Secure trim flush to corners with 2 finish nails evenly spaced as shown Your corner trim is now installed 3 2 Flush un...

Page 36: ...flush to front panel edge and center on right edge of groove Fig A Secure trim with 10 1 1 4 screws from inside Position second CL flush to panel edge and flush to installed CL Fig A Secure trim with...

Page 37: ...ntil it is 1 2 from the roof panel Fig C Secure panel with 2 2 nails in the corners 48 x 96 121 9 x 243 8 cm x1 2 3 1 BEGIN Before installing first roof panel measure down 48 from rafter peak and mark...

Page 38: ...x 121 9 cm Install 1 47 7 8 x 48 panel flush to the installed panel and flush at the peak Fig B Secure panel with 2 2 nails in the corners Move to the opposite end Move the gable trim until it is 1 2...

Page 39: ...nails in the corners Install the 5 7 8 x 96 panel flush to upper installed panels Use the gauge block to ensure the 3 4 measurement on the rafter Fig A Secure the panel with 2 nails in the corners Co...

Page 40: ...tom of gable panels and aligned with stud Secure each with 6 2 nails evenly spaced 1 BEGIN PARTS REQUIRED 48 1 2 123 2 cm TRIM TO TRIM 48 1 2 123 2 cm Note Edge may result here Align stud and trim x12...

Page 41: ...ort Arrange parts as shown on flat surface Center temporary part GUA over door PARTS REQUIRED x1 BEGIN 1 DOOR 2 5 1 cm Secure temporary support GUA with 4 2 screws x4 CENTER CENTER Temporary Support x...

Page 42: ...6 cm 1 4 0 6 cm 2 5 1 cm Screws OO Flush to bottom of trim Fig A PARTS REQUIRED DOOR 2 5 1 cm x4 x1 BEGIN 1 Install temporary support OO flush to bottom of door trim Fig A Secure with 2 3 screws Locat...

Page 43: ...at step for bottom hinge 1 4 0 6 cm 1 4 0 6 cm 1 4 0 6 cm 1 4 0 6 cm 1 2 5 cm 1 2 5 cm Flush Flush VERIFY 1 4 GAP 1 2 5 cm Screws x3 1 2 5 cm Screws x3 2 1 2 6 3 cm Screws x4 2 1 2 6 3 cm Screws x3 Do...

Page 44: ...outside of door Fig B Place 1 3 4 x 69 batten flush to front of studs and center between floor and over door header Fig C Fig D Secure with 5 3 4 screws Reinforce door with 3 4 screws 3 4 1 9 cm x24...

Page 45: ...3 8 cm Bugle Head Bolt 9 11 10 12 PARTS REQUIRED DOOR HARDWARE Place middle hinge centered on door and 1 2 5 cm from the outside of trim Secure hinge with 2 1 2 screws on trim and 1 screws on door Pre...

Page 46: ...r door trim and hardware items are now installed Install hasp door and latch on door trim Bottom edge of hasp is 36 91 4 cm up from bottom edge of door trim Measure and mark locations Secure with 3 4...

Page 47: ...s are level and flush to roof panels Your collar ties are now installed x12 2 5 1 cm COLLAR TIES PARTS REQUIRED BEGIN 1 x2 1 x 3 x 60 2 5 x 7 6 x 152 4 cm GUA 2nd 4th HINT For best appearance install...

Page 48: ...rior wood before painting Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUD...

Page 49: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 50: ...5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first row s rain slot...

Page 51: ...verlap at ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk lin...

Page 52: ...f pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1...

Page 53: ...e sure there is 4 between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have fin...

Page 54: ...48000514000 2 Floor Panel A OSB 5 8 X 4 X 8 11117 2 Floor Panel B 5 8 OSB 44 5 8 X 96 E 96004410000 1 Eave Wall Bottom Plate A 5 8 OSB 2 1 2 X 94 5 16 E 94050208000 2 Eave Wall Bottom Plate B 5 8 OSB...

Page 55: ...B siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit Thi...

Reviews: