33
BEGIN
1
FRONT GABLE UNIT INSTALLATION
Preassembled
1"
(2,5 cm )
Measure and
Mark
NAIL FIRST
2"
(5,1 cm)
PARTS REQUIRED:
2" (5,1 cm)
x18
x2
3" (7,6 cm)
NAIL FIRST
2"
(5,1 cm)
DOUBLER
1"
(2,5 cm )
Measure and
Mark
BV
Fig. A
DOUBLER
3"
(7,6 cm)
Screws
6"
(15,2 cm)
FINISH
Your front gable unit is now installed.
Continue nailing lower edge of panels to top plate doublers with 1-1/2" nails spaced 6" apart.
2
Lift and set back gable unit on back wall top plate, overlapping wall panels.
Working inside, secure gable unit with (2) 3" screws into
BV
, angled into top plate
(Fig. A)
.
Measure 1" (2,5 cm) down from top plate and mark at each side, as shown.
Hold secure with (1) 2" nail on each side.
ENSURE GABLE IS CENTERED ON WALL BEFORE NAILING.
3