4
COMPLETING YOUR SHED
You will need these additional materials:
TO VALIDATE WARRANTY YOU MUST USE THE FOLLOWING:
ADDITIONAL MATERIALS
DRIP EDGE ..................... 20 Feet
#15 ROOFING FELT
To cover 126 Sq. Ft. of roof area.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR
INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TAB SHINGLES ............................. 5 Bundles
PAINT FOR SIDING .......................... 2 Gallons
Use 100% acrylic latex exterior paint. (2) coats recommended.
CAULK ................................................. 3 Tubes
Use acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 3 Lbs
For shingles.
PAINT FOR TRIM .............................1 Quart
Use 100% acrylic latex exterior paint.
REINFORCED WOOD FLOOR FRAME (OPTIONAL)
IMPORTANT!
The included floor has been designed for general use. Depending on your specific use you may want to construct a
heavy duty floor frame by adding additional floor joists (shown below as shaded). Below is a list of additional materials (not included):
x6
x24
2 x 4 x 8' (5,1 x 10,2 x 243,8 cm) Treated Lumber
Cut to 2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)
ea. 3" (7,6 cm) Hot Dipped Galvanized Nails
Optional
12"
(30,5 cm)
spacing
Standard
24"
(61 cm)
spacing
FOUNDATION OR FLOOR MATERIALS
• This shed kit includes a wood floor system.
• This shed does not include any leveling materials.
•
See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly
level your foor, as this will vary depending on your specific site.
1" GALVANIZED ROOFING NAILS.....1/4 Lb
For roofing felt.