35
PARTS REQUIRED:
GABLE END WALLS
x90
2" (5,1 cm)
You have finished building your two gable end walls.
FINISH
8
6
7
Carefully flip the gable end wall over.
Repeat Steps 1-6 to build another
gable end wall.
23-7/8 x 84"
(60,6 x 213,4 cm)
x1
48 x 84"
(122 x 213,4 cm)
x1
Flush
Maintain
Flush
Flush
For squareness maintain flush
along panel edges.
48"
(122 cm)
23-7/8"
(60,6 cm)
12"
(30,5 cm)
6"
(15,2 cm)
Flush
Place
23-7/8" x 84"
primed side up and flush with installed
48" x 84"
panel edge. Ensure panel is
flush at top. Secure using 2" (5,1 cm) nails 6" (15,2 cm) apart on edges.
Place
48" x 84"
primed side up and flush with installed
23-7/8" x 84"
panel edge. Ensure panel is flush at
top. Secure using 2" (5,1 cm) nails 6" (15,2 cm) apart on edges and 12" (30,5 cm) apart on inside of panel.
4
5