background image

41

3" (7,6 cm)

PARTS REQUIRED:

RAFTERS

x3

x2

x26

24"

(61 cm)

24"

(61 cm)

24-3/8"

(61,9) cm)

24-3/8"

(61,9) cm)

Preassembled Rafter

with 2 Gussets

Preassembled Rafter

with 1 Gusset

FINISH

You have finished attaching your Rafters.

BEGIN

¸

1

Secure rafters to top plate with two 3" screws above notch, as shown in  

(Fig. A, B)

.

Note the One Gusset Rafters at each end. 

Align over

studs.

Flush to

outside of 

panel

Flush to

outside of 

panel

Fig. A

BEGIN

HERE

Fig. B

Tight to side wall

(3) 3" (7,6 cm)

Screws

Summary of Contents for Yardline AUBURN GABLE

Page 1: ...embly or product information call our toll free number 1 800 844 9273 or email customerservice yardline net Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST Sa...

Page 2: ...This page intentionally left blank...

Page 3: ...must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 7 CHECK ALL PARTS Inventory all parts listed on pages 4 6 Contact our Customer Service...

Page 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Page 5: ...elow is a list of additional materials not included x2 x8 2 x 4 x 8 5 x 10 x 244 cm Treated Lumber Cut to 2 2 x 4 x 93 5 x 10 x 236 cm ea 3 7 6 cm Hot Dipped Galvanized Nails Optional 12 30 5 cm spaci...

Page 6: ...3 4 x 73 7 8 1 x 4 4 x 187 6 cm x4 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 3 4 1 9 cm 3 8 x 3 1 4 x 5 7 8 1 x 8 3 x 14 9 cm SHIM x2 1 x 3 x 5 2 5 x 7 6 x 12 7 cm Gauge Block for 3 4 1 9 cm measurement x1...

Page 7: ...x 243 8 cm x2 7 16 x 11 7 8 x 96 1 1 x 30 2 x 243 8 cm x1 7 16 x 23 7 8 x 44 1 4 1 1 x 121 9 x 112 4 cm x2 3 8 x 8 x 12 1 2 1 x 20 3 x 31 8 cm x5 x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 2 x 3 x10 1 8 5...

Page 8: ...6 cm 3 4 1 9 cm 2 5 0 cm 1 1 2 3 8 cm x2 Transom window 1 2 5 cm 1 2 1 3 cm 1 1 4 3 2 cm x1 x1 x6 8 x 16 20 3 x 35 6 cm Wall Vent x1 48 Metal Threshold 3 4 1 9 cm x11 Bagged seperately special coatin...

Page 9: ...ONCRETE Leveling higher than 16 not recommended LEVELING MATERIALS Gravel 2x4 Treated Lumber Solid Masonry Blocks in 1 2 4 or 8 thickness Asphalt Shingles 8 Block 4 Block Gravel Gravel Do not exceed 1...

Page 10: ...ing approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure for at least seven 7 days 2x4 x 7 5 5 1 x 10 2 x 226 c...

Page 11: ...er nailing stand on frame 1 Orient parts as shown on flat surface Measure and mark Use two 3 nails at each mark Fig A You have finished your floor frame Proceed to level and square frame BEGIN FINISH...

Page 12: ...asurements are the same the frame is square The diagonal measurement will be approximately 135 3 4 344 8 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fas...

Page 13: ...ck the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame is square The measurement will be approximately 135 3 4 344 8 cm Fig C P...

Page 14: ...oor panels Continue installing 2nd panel using 2 nails 6 apart on edges and 12 apart inside panels 5 x1 5 8 x 48 x 96 1 6 x 121 9 x 243 8 cm x62 2 5 1 cm FLOOR PANELS 96 243 8 cm Flush 6 15 2 cm 12 30...

Page 15: ...L Check the floor frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedur...

Page 16: ...3 screws Measure over 96 3 4 and install a second CLA flush to the floor deck CLA will overhang the floor Secure using two 3 screws 96 3 4 245 7 cm IMPORTANT MEASUREMENT Fig B Fig A It is very importa...

Page 17: ...afters over and attach a second gusset using glue and 12 2 nails No need to use jig for this gusset 3 2 Keep CNA firm against outside CLA as shown Fig A Rafters should touch at tips Fig A Apply glue t...

Page 18: ...1 9 cm GAP CNA x2 CNA x2 Fig A Fig B Fig C Glue where gusset installs Keep rafters firmly against CLA at both ends when securing gusset You have finished assembling your rafters Remove CLA s from flo...

Page 19: ...B on top of TCA Glue both sides of OSB Nail using 3 nails in the pattern shown Place another TCA on top of OSB 2 3 1 BEGIN You have assembled your door header FINISH 1 OSB TCA TCA Flip header assembly...

Page 20: ...T For easier nailing stand on frame 2 x 4 x 89 5 x 10 2 x 226 1 cm x1 SZ 3 7 6 cm PARTS REQUIRED x56 FRONT WALL BEGIN 1 Use two 3 nails at each mark Orient parts on edge on floor Measure and mark 89 2...

Page 21: ...frame flush to top of SZ as shown primed side up There will be a 3 1 2 overlap on either end of the wall Secure panel with 2 nails 6 15 2 cm apart Maintain a 48 opening with OO as a temporary brace as...

Page 22: ...EQUIRED Center on marks TP TP TM x5 48 122 cm 24 61 cm 72 182 9 cm 96 243 8 cm 75 190 5 cm 72 182 9 cm 1 BEGIN Orient parts on edge on floor Measure and mark from end of boards IMPORTANT You will buil...

Page 23: ...long right side Maintain 3 4 measurement along edge Secure panel to frame using 2 5 1 cm nails 6 15 2 cm apart along edges For squareness maintain flush at top and along panel edge 6 15 2 cm 3 4 1 9 c...

Page 24: ...primed side facing up flush with first panel Nail using 2 nails 6 apart on edges and 12 apart inside panel 3 To draw panels tight at seams angle nail Carefully flip your sidewall over Repeat STEPS 1 3...

Page 25: ...m 20 1 2 52 1 cm 20 1 2 52 1 cm PARTS REQUIRED x2 2 x 4 x 89 5 x 10 2 x 226 1 cm SZ x5 2 x 4 x 72 5 x 10 2 x 182 9 cm TM x20 3 7 6 cm 23 GABLE END WALL TM x5 SZ SZ 3 7 6 cm Nails HINT For easier naili...

Page 26: ...A Primed side up 48 x 76 121 9 x 193 cm x1 3 4 GAUGE BLOCK BEGIN HERE For squareness maintain flush and 3 4 measurement along panel edges Flush 2 Secure panel to frame using 2 5 1 cm nails 6 15 2 cm a...

Page 27: ...L Secure using 2 5 1 cm nails 6 15 2 cm apart on edges and 12 30 5 cm apart on inside of panel Place right panel flush to left panel with primed side up x48 2 5 1 cm 3 You have finished building your...

Page 28: ...to floor frame using 2 nails 6 apart Angle nail to hit floor frame Fig A 2 Nail side wall bottom plate to floor using eight 3 nails 3 FINISH 96 243 8 cm 3 7 6 cm Screws 6 15 2 cm Nail 2 nails first An...

Page 29: ...all FINISH Secure rear wall to floor using 3 nails Fig C Nail rear wall panel to side wall stud using 1 1 2 nails 6 apart Fig C 4 5 6 15 2 cm Flush Fig A 2 5 1 cm Nails Fig B 2 5 1 cm Nail Angle nail...

Page 30: ...the rear wall FINISH Secure side wall to floor using 3 nails Fig D Nail back wall panel to side wall stud using 1 1 2 nails 6 apart Fig C 4 5 6 15 2 cm Fig A Fig B Fig C 2 5 1 cm Nail Angle nail to h...

Page 31: ...3 8 cm PARTS REQUIRED 3 7 6 cm x6 2 5 1 cm x4 BEGIN Remove Temporary Supports and stand gable door wall on floor Fig B 2 5 1 cm Screw 2 5 1 cm Screw Flush Flush Fig A 2 5 1 cm Screw Flush Flush Flush...

Page 32: ...o eave wall studs using 1 1 2 nails 6 apart Fig E 2 5 1 cm Nails Angle nail to hit floor frame Fig F FINISH 4 3 5 3 7 6 cm Screw 1 1 2 3 8 cm Nails Fig E Secure gable door wall top frame 2 x 4 using 3...

Page 33: ...S 1 5 8 4 1 cm Attach temporary support OO with 3 screws in middle and at ends as shown Attach temporary support GAA with two 1 5 8 screws as shown OO GAA OFFSET 4 3 7 6 cm Screws Screws 1 1 4 3 cm Bo...

Page 34: ...mporary supports and check doors open properly 3 Screw hinge boards into wall supports and floor using ten 3 screws as shown 3 7 6 cm Screws Fig B 3 8 1 cm Attach temporary support OO as a ledger boar...

Page 35: ...ld between doors and secure using eight 3 4 special coating screws into floor as shown Fig C 7 4 Secure horizontal door rails BEA with three 3 4 screws per each rail from behind to center of doors as...

Page 36: ...r rated caulk From back side of door position window in opening and ensure square with door edge Use four screws to secure each window 9 8 Apply high quality exterior grade caulk on the backside of do...

Page 37: ...2 screws through outside trim into OO Fig A 1 PARTS REQUIRED x14 2 5 1 cm DOOR STIFFENERS FINISH Center OO vertically on the right door in the door opening offset 3 4 1 6 cm with the edge of door Fig...

Page 38: ...d mark location of hole on outside of right door as shown Fig A Pre drill hole with 1 4 drill 3 4 1 9 cm x12 You have finished installing your decorative hinges and have prepared your door for door ha...

Page 39: ...UIRED Backplate x1 1 1 4 x2 Handle locking with Screws x1 1 1 4 x8 3 Point Door Locking Mechanism RIGHT DOOR Set Screw 1 1 4 Wood Screw 1 1 4 Pan Head Screw Secure backplate with 1 screws and handle w...

Page 40: ...ations of brackets and plates Washer Washer UPPER BRACKET with offset Orient bracket as shown Washer Washer Plate 1 1 4 Pan Head Screw Orient bracket as shown LOWER BRACKET with offset Plate 1 1 4 Pan...

Page 41: ...39 45o DOOR HARDWARE 2 1 4 2 1 4 TOP of Door RIGHT DOOR LEFT DOOR Make sure rods are straight up and down when locating brackets BOTTOM of Door Weatherstrip IMPORTANT This rod to edge of weatherstrip...

Page 42: ...40 DOOR HARDWARE Align Plates with vertical rod points Drill thru with 3 8 drill bit to 2 depth into header and floor FRAMING PLATE FLOOR VERTICAL RODS PLATE Drill with 3 8 bit to 2 depth...

Page 43: ...ssembled Rafter with 1 Gusset FINISH You have finished attaching your Rafters BEGIN 1 Secure rafters to top plate with two 3 screws above notch as shown in Fig A B Note the One Gusset Rafters at each...

Page 44: ...el FRONT GABLE PANEL PARTS REQUIRED x1 x1 Primed side up Primed side up Flush 1 3 4 4 5 cm 1 1 2 3 8 cm 1 1 2 3 8 cm Nails UY on flat CQA on flat Orient parts on flat as shown Place LEFT front gable p...

Page 45: ...LE PANEL PARTS REQUIRED x1 x1 Primed side up Primed side up 1 3 4 4 5 cm 1 1 2 3 8 cm 1 1 2 3 8 cm Nails SBA on flat Orient parts on flat as shown Place LEFT front gable panel as shown and secure usin...

Page 46: ...BEFORE NAILING 2 Continue nailing lower edge of panels into top plate using 2 nails 6 apart as shown in Fig A You have finished attaching your gable units FINISH 2 5 1 cm x76 Fig B TOP PLATE CQA 3 7...

Page 47: ...n top Secure using 3 screws as shown Fig A Ensure parts are flush along edges 2 3 4 1 BEGIN You will build two assemblies Fig B x4 2 x 4 x 61 7 8 5 1 x 10 2 x 157 2 cm CMA x8 2 x 4 x 4 7 8 5 1 x 10 2...

Page 48: ...9 x 33 3 cm Left Ladder Frame Right Ladder Frame 7 16 x 9 x 48 1 3 x 22 9 x 243 8 cm 7 16 x 9 x 13 7 8 7 16 x 9 x 48 Flush You have finished building your gable assemblies Place each ladder assembly w...

Page 49: ...1 cm nails 3 7 6 cm x14 Flush Flush Secure the overhang onto the rafter using 2 5 1 cm nails spaced six inches apart Fig C Secure using 3 7 6 cm screws through the underside of the ladder assembly thr...

Page 50: ...ll roof panels need to be installed with the rough side up painted grid lines 7 16 x 13 7 8 x 96 1 1 x 35 2 x 243 8 cm x1 Flush Attach a 13 7 8 x 96 roof panel flush to installed lower panel and flush...

Page 51: ...2 nails 6 apart on edges and 12 apart inside panel You have finished installing your roof panels Repeat STEPS 1 4 to attach roof panels on the opposite side 5 PARTS REQUIRED ROOF PANELS FINISH 6 15 2...

Page 52: ...C gable end and right overhang board Fig D Secure using twelve 2 finish nails Ensure soffit boards are flush at seam Fig B and flush at peak Fig D x2 3 8 x 7 7 8 x 59 15 16 1 x 20 x 152 2 cm x24 2 5 1...

Page 53: ...ffit boards on the opposite side Toenail at center seam Fig C Ensure soffit boards are flush at rafter ends Fig B and flush at seams x2 3 8 x 5 7 8 x 72 3 4 1 x 14 9 x 184 8 cm x2 3 8 x 5 7 8 x 24 3 4...

Page 54: ...wn Secure using 2 finish nails into rafter ends Fig A B Repeat Step 1 on opposite eave You have finished installing your eave side fascia FINISH 1 BEGIN PARTS REQUIRED x2 3 8 x 4 3 4 x 80 5 8 1 x 12 1...

Page 55: ...spaced evenly as shown Repeat Step 2 to attach fascia boards on the front side Front side is without 3 1 4 x 5 7 8 shims 3 You have finished installing your back gable fascia FINISH 1 BEGIN Hint Pre...

Page 56: ...op as shown Repeat Steps 1 2 to attach trim to all four corners Finish attaching trim flush to corners Fig A using six 2 5 1 cm finish nails as shown You have attached your corner trim 3 2 73 7 8 187...

Page 57: ...left side Secure shelf supports at shown height with three 2 5 1 cm nails 1 BEGIN 2 x30 2 5 1 cm 3 8 x 8 x 12 1 2 1 x 20 3 x 31 8 cm x5 2 x 3 x10 1 8 5 1 x 7 6 x 25 7 cm AE x5 PARTS REQUIRED AE x4 x1...

Page 58: ...ch support Secure KP with two 2 5 1 cm nails at each support as shown 3 FINISH You have finished installing your shelves 4 x10 x10 1 1 4 3 2 cm 2 5 1 cm 7 16 x 11 7 8 x 96 1 1 x 30 2 x 243 8 cm x1 1 x...

Page 59: ...RITY 3 7 6 cm Nails TP x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x11 3 7 6 cm x28 2 5 1 cm x2 7 16 x 23 7 8 x 44 1 4 1 1 x 112 4 x 104 cm Flush Attention Load not to exceed 400 lbs 181 kg evenly distribu...

Page 60: ...d level collar tie on third rafter from front HINT For best appearance install collar tie on rafter facing away from door opening Attach with 2 nails as shown You have finished installing your collar...

Page 61: ...IRED FINISH BEGIN 1 Locate vent in the front gable wall as shown You have finished installing your vent Secure using 1 2 5 cm screws x1 GABLE VENT 15021 x4 8 x 1 2 5 cm Pan Head Screws 8 x 1 2 5 cm Pa...

Page 62: ...st if you have a gable vent Measure and mark vent hole in wall as shown Cut out marked opening Caulk behind vent flanges Secure using 1 2 1 3 cm screws You have finished installing your wall vent 3 5...

Page 63: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Page 64: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 65: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Page 66: ...t ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Page 67: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Page 68: ...between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Page 69: ...aint and seal all exposed edges sides and faces of siding trim and OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necess...

Reviews: