47
2
4
3
1
BEGIN
PARTS REQUIRED:
LADDER ROOF PANELS
LEFT Front Ladder Assembly
RIGHT Front Ladder Assembly
x1
x1
Position the
Left
front ladder assembly to the front gable flush at the center of the gable
panels and secure with one 2" (5,1 cm) nail into the rafter at each end of the overhang
(Fig A)
.
Fig. A
x24
2" (5,1 cm)
2" (5,1 cm)
nails
3" (7,6 cm)
x14
Flush
Flush
Secure the overhang onto the rafter using 2" (5,1 cm)
nails spaced six inches apart
(Fig. C)
.
Secure using 3" (7,6 cm) screws through the underside
of the ladder assembly through the panel and into the
rafter as shown
(Fig. B, C)
.
Toenail ladder assemblies together at the outside peak using
3" (7,6 cm) screws
(Fig. D).
Repeat steps 1 through 3 to attach the
Right
front ladder assembly.
Fig. D
Fig. C
Toenail
3" (7,6 cm)
screws
3" (7,6 cm)
screws
3" (7,6 cm)
screws
FINISH
Fig. B
2" (5,1 cm)
nails
Nail First
2" (5,1 cm)