51
PARTS REQUIRED:
EAVE SIDE SOFFITS
Position
72-3/4"
and
24-3/4"
soffit boards
primed side down
flush to gable soffits and rafter
ends. Secure using eight 2" finish nails, two in each rafter
(Fig A, B, C )
.
Repeat
Step 1
to attach eave side soffit boards on the opposite side.
Toenail at center seam
(Fig. C)
.
Ensure soffit boards are flush at rafter ends (Fig. B) and flush at seams
.
x2
3/8 x 5-7/8 x 72-3/4" (1 x 14,9 x 184,8 cm)
x2
3/8
x
5-7/8
x
24-3/4" (1
x
14,9
x
62,9
cm
)
x24
2" (5,1 cm)
2
1
BEGIN
You have finished installing your eave side soffit panels.
FINISH
Primed Side Down
72-3/4"
soffit board
24 -3/4"
soffit board
Fig. A
2" (5,1 cm) Nails
x8
Flush
Fig. B
Fig. C
Flush
TOENAILING
AT SEAM