Set gable end wall on fl oor and secure top of wall
using one 2" screw into top plate
(Fig A)
.
1
43
GABLE END WALL INSTALLATION
3" (7,6 cm)
2" (5,1 cm)
x22
2" (5,1 cm)
x2
x1
x14
1-1/2" (3,8 cm)
PARTS REQUIRED:
3" (7,6 cm)
x10
It is important to secure the gable end wall
in the following order:
ENSURE TOP OF WALL FRAMES ARE FLUSH.
3
2
Nail lower edge of panels to fl oor using 2" nails 6" apart.
Angle nail to hit fl oor frame
(Fig. B)
.
ENSURE GABLE AND EAVE WALL PANELS
ARE FLUSH BEFORE SECURING.
You have fi nished standing your GABLE END WALL.
FINISH
7
Secure gable wall to fl oor using 3" nails
(Fig. C)
.
Nail gable wall panel to eave wall stud
using 1-1/2" nails 6" apart
(Fig. C)
.
4
5
6
6"
(15,2 cm)
Flush
Fig. A
Fig. B
2" (5,1 cm)
Nail
Angle nail to hit
fl oor frame.
Secure gable wall top frame 2 x 4 using one 3" screw
toe-screwed into eave wall frame at an angle as
shown
(Fig. D)
.
6"
(15,2 cm)
3" (7,6 cm)
Nails
1-1/2"
(3,8 cm)
Nails
Fig. D
3" (7,6 cm)
Screw
BEGIN
Stand gable end wall on fl oor.
2" (3,8 cm)
Screw
2"
(5,1 cm)
Screw
Fig. C
Move to the bottom of gable end wall and
secure bottom of wall using one 2" screw into
eave wall bottom plate
(Fig A)
.
Flush
STEP
1
FIRST
SCREW
2" (5,1 cm)
Nails
STEP
3
STEP
2
SECOND
SCREW
2"
(5,1 cm)
Screw
Flush