background image

Set gable end wall on fl oor and secure top of wall 

using one 2" screw into top plate 

(Fig A)

.

1

43

GABLE END WALL INSTALLATION

3" (7,6 cm)

2" (5,1 cm)

x22

2" (5,1 cm)

x2

x1

x14

1-1/2" (3,8 cm)

PARTS REQUIRED:

3" (7,6 cm)

x10

It is important to secure the gable end wall 

in the following order:

ENSURE TOP OF WALL FRAMES ARE FLUSH.

3

2

Nail lower edge of panels to fl oor using 2" nails 6" apart. 

Angle nail to hit fl oor frame 

(Fig. B)

.

ENSURE GABLE AND EAVE WALL PANELS 

ARE FLUSH BEFORE SECURING.

You have fi nished standing your GABLE END WALL.

FINISH

7

Secure gable wall to fl oor using 3" nails 

(Fig. C)

.

Nail gable wall panel to eave wall stud 

using 1-1/2" nails 6" apart 

(Fig. C)

.

4

5

6

6"

(15,2 cm)

Flush

Fig. A

Fig. B

2" (5,1 cm) 

Nail

Angle nail to hit 

fl oor frame.

Secure gable wall top frame 2 x 4 using one 3" screw 

toe-screwed into eave wall frame at an angle as 

shown 

(Fig. D)

.

         6"

(15,2 cm)

3" (7,6 cm) 

Nails

1-1/2"

(3,8 cm) 

Nails

Fig. D

3" (7,6 cm) 

Screw

BEGIN

Stand gable end wall on fl oor.

2" (3,8 cm) 

Screw

2"

(5,1 cm) 

Screw

Fig. C

Move to the bottom of gable end wall and 

secure bottom of wall using one 2" screw into 

eave wall bottom plate 

(Fig A)

.

Flush

STEP 

1

 FIRST 

SCREW

2" (5,1 cm) 

Nails

STEP 

3

STEP 

2

 SECOND 

SCREW

2"

(5,1 cm) 

Screw

Flush

Summary of Contents for Yardline BELLINGHAM GABLE 10' x 16'

Page 1: ...embly or product information call our toll free number 1 800 844 9273 or email customerservice yardline net Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST Sa...

Page 2: ...This page intentionally left blank...

Page 3: ...ilding ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level s...

Page 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Page 5: ...hown below as shaded Below is a list of additional materials not included x3 x12 2 x 4 x 10 5 x 10 x 304 8 cm Treated Lumber Cut to 3 2 x 4 x 117 5 x 10 x 297 2 cm ea 3 7 6 cm Hot Dipped Galvanized Na...

Page 6: ...5 1 x 10 2 x 243 8 cm TP 3 4 1 9 cm 1 x 3 x 5 2 5 x 7 6 x 12 7 cm Gauge Block for 3 4 1 9 cm measurement x1 GAA DOOR OO x2 1 1 2 x 2 1 2 x 69 3 8 x 6 3 x 175 3 cm 4 x14 6 x 24 15 2 x 61 cm OSB OR WOO...

Page 7: ...IST x10 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x1 RIGHT DOOR x1 LEFT DOOR x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x2 x2 x2 2 x 4 x 24 5 1 x 10 2 x 61 cm RL x5 x1 7 16 x...

Page 8: ...cm 2 5 1 cm 1 1 2 3 8 cm x2 10 1 2 x 32 1 2 26 7 x 82 6 cm 1 2 5 cm x2 x1 64 Metal Threshold 3 4 1 9 cm x11 Bagged seperately special coating x16 1 2 5 cm x4 x1 x4 3 4 Tech Screw with drill point 1 1...

Page 9: ...ding your shed on a concrete foundation see the following page CONCRETE MATERIAL REQUIRED x3 4 x 4 x 16 10 x 10 x 488 cm Treated Lumber Fasteners for Frame to 4 x 4 3 Screws shown as one option Minimu...

Page 10: ...l sill plates Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs...

Page 11: ...sure and mark BEGIN You have finished your floor frame Proceed to level and square frame FINISH 3 Flush Flush You will need to cut 2 x 4 x 120 boards down to 117 x2 2 x 4 x 192 5 1 x 10 2 x 487 7 cm L...

Page 12: ...ill be approximately 226 7 16 575 2 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Se...

Page 13: ...quaring frame Fig C Check the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame is square The measurement will be approximately 2...

Page 14: ...part inside panels 5 7 6 x2 5 8 x 48 x 96 1 6 x 122 x 243 8 cm x2 5 8 x 47 7 8 x 48 1 6 x 121 9 x 122 cm x2 5 8 x 23 7 8 x 96 1 6 x 60 6 x 243 8 cm x238 2 5 1 cm FLOOR PANELS Grid lines up 5 8 x 48 x...

Page 15: ...EAVE SIDE WALL Check the floor frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your ass...

Page 16: ...at both ends for squareness BEGIN 1 Secure one PVA flush to the floor deck using two 3 screws Measure over 120 3 4 and install a second PVA flush to the floor deck PVA will overhang the floor Secure...

Page 17: ...attach a second gusset using glue and 12 2 nails No need to use jig for this gusset 4 5 3 2 Keep ECN firm against outside PVA s as shown Fig A and push rafters tight to the middle PVA Rafters should...

Page 18: ...OUR WALLS OPTIONAL DOOR LOCATED ON EAVE SIDE WALL toward right EAVE SIDE WALL WITH DOOR RIGHT IF YOU CHOOSE TO LOCATE THE DOOR TOWARD THE RIGHT GO TO Page 21 TO BEGIN BUILDING YOUR WALLS OPTIONAL DOOR...

Page 19: ...ALL WITH DOOR x2 2 x 4 x 32 1 2 5 1 x 10 2 x 82 5 cm QS 32 1 2 82 5 cm 32 1 2 82 5 cm BEGIN 1 Use two 3 nails at each mark Orient parts on edge on floor Measure and mark 2 Maintain 67 dimension 104 1...

Page 20: ...2 x 4 x 68 1 2 5 x 10 2 x 174 cm YFA 18 HINT For easier nailing stand on frame 3 7 6 cm PARTS REQUIRED x32 GABLE END WALL WITH DOOR 3 Orient parts on edge Use two 3 nails at each location AM YFA YFA...

Page 21: ...e up as shown Secure panel with two 2 nails 6 15 2 cm apart Repeat Step 4 to attach the right 48 x 84 panel 5 4 48 x 84 121 9 x 213 4 cm x1 LEFT 1 RIGHT Maintain Flush Maintain Flush Primed side up Pr...

Page 22: ...primed side up as shown Secure panel with two 2 nails 6 15 2 cm apart Repeat Step 4 to attach the right 11 7 8 x 84 panel 7 6 You have finished building your front door wall FINISH 9 11 7 8 x 84 30 2...

Page 23: ...x 4 x 96 5 1 x 10 2 x 243 8 cm TP x8 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x1 2 x 4 x 67 5 1 x 10 2 x 170 2 cm AM x3 2 x 4 x 8 1 2 5 1 x 10 2 x 21 6 cm CPA CPA x3...

Page 24: ...E SIDE WALL WITH DOOR RIGHT PARTS REQUIRED 3 7 6 cm x32 Orient parts on edge on floor as shown Use two 3 nails as shown AM x1 2 x 4 x 67 5 1 x 10 2 x 170 2 cm AM x2 2 x 4 x 68 1 2 5 x 10 2 x 174 cm YF...

Page 25: ...2 nails 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move...

Page 26: ...REQUIRED 2 5 1 cm 10 9 Carefully flip the DOOR WALL over Repeat STEP 8 for 48 x 84 right door panel 3 4 1 9 cm 3 4 1 9 cm 48 121 9 cm 12 30 5 cm 6 15 2 cm 6 15 2 cm 48 x 84 121 9 x 213 4 cm x1 48 x 8...

Page 27: ...x 4 x 96 5 1 x 10 2 x 243 8 cm TP x8 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x1 2 x 4 x 67 5 1 x 10 2 x 170 2 cm AM x3 2 x 4 x 8 1 2 5 1 x 10 2 x 21 6 cm CPA CPA x3...

Page 28: ...SIDE WALL WITH DOOR CENTERED PARTS REQUIRED 3 7 6 cm x32 Orient parts on edge on floor as shown Use two 3 nails as shown AM x1 2 x 4 x 67 5 1 x 10 2 x 170 2 cm AM x2 2 x 4 x 68 1 2 5 x 10 2 x 174 cm Y...

Page 29: ...g 2 nails 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever mo...

Page 30: ...apart inside panel 8 You have finished building your DOOR WALL FINISH 11 x130 EAVE SIDE WALL WITH DOOR CENTERED PARTS REQUIRED 2 5 1 cm 10 9 Carefully flip the DOOR WALL over 6 15 2 cm 6 15 2 cm 48 12...

Page 31: ...x 4 x 96 5 1 x 10 2 x 243 8 cm TP x8 2 x 4 x 80 5 1 x 10 2 x 203 2 cm TK x2 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x1 2 x 4 x 67 5 1 x 10 2 x 170 2 cm AM x3 2 x 4 x 8 1 2 5 1 x 10 2 x 21 6 cm CPA CPA x3...

Page 32: ...SIDE WALL WITH DOOR LEFT 3 PARTS REQUIRED 3 7 6 cm x32 Orient parts on edge on floor as shown Use two 3 nails as shown AM x1 2 x 4 x 67 5 1 x 10 2 x 170 2 cm AM x2 2 x 4 x 68 1 2 5 x 10 2 x 174 cm YFA...

Page 33: ...2 nails 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever move...

Page 34: ...S REQUIRED 2 5 1 cm 10 9 Carefully flip the DOOR WALL over Repeat STEP 8 for 48 x 84 left door panel 3 4 1 9 cm 3 4 1 9 cm 48 121 9 cm 12 30 5 cm 6 15 2 cm 6 15 2 cm 48 x 84 121 9 x 213 4 cm x1 48 x 8...

Page 35: ...Use two 3 nails at each mark and four 3 nails at seams Orient parts on edge on floor Measure and mark 2 TK x9 SP SP TP TP TP TOENAILING x3 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x9 2 x 4 x 80 5 1 x 10 2...

Page 36: ...2 nails 6 apart on edges and 12 apart inside panel Ensure your wall frame is square by installing one panel and squaring frame Move to the opposite end Using the long edge of the panel as a lever mov...

Page 37: ...nails 6 apart on edges x3 x90 EAVE SIDE WALL NO DOOR PARTS REQUIRED 2 5 1 cm 9 10 8 Carefully flip the eave wall over Repeat STEP 8 for 4th 48 x 84 panel 3 4 1 9 cm 3 4 1 9 cm 48 121 9 cm 12 30 5 cm...

Page 38: ...s TK x6 STL YFA YFA STL 3 7 6 cm Nails 44 1 2 113 cm 44 1 2 113 cm 92 1 2 235 cm 68 1 2 174 cm 68 1 2 174 cm 68 1 2 174 cm 20 1 2 52 1 cm 1 1 2 3 8 cm 113 287 cm 113 287 cm x2 2 x 4 x 68 1 2 5 1 x 10...

Page 39: ...rame flush at top and with a 3 4 gap on right side Maintain 3 4 measurement along edge x52 2 5 1 cm 37 GABLE END WALL A 12 30 5 cm 3 1 2 8 9 cm 3 4 GAUGE BLOCK GAA 48 x 84 122 x 213 4 cm x1 3 4 GAUGE...

Page 40: ...intain flush along panel edges 48 122 cm 23 7 8 60 6 cm 12 30 5 cm 6 15 2 cm Flush Place 23 7 8 x 84 primed side up and flush with installed 48 x 84 panel edge Ensure panel is flush at top Secure usin...

Page 41: ...END WALL BEGIN HERE IF YOU CHOSE THE GABLE END WALL FOR DOOR LOCATION STOP HERE GO TO PAGE 42 3 7 6 cm Nails 3 7 6 cm Nails 1 1 2 3 8 cm TOENAILING HINT For easier nailing stand on frame BEGIN 1 Use t...

Page 42: ...up onto frame flush at top and with a 3 4 gap on right side Maintain 3 4 measurement along both edges x52 2 5 1 cm 40 GABLE END WALL B 12 30 5 cm 3 4 GAUGE BLOCK GAA 48 x 84 122 x 213 4 cm x1 3 4 GAU...

Page 43: ...48 x 84 panel primed side up and flush with installed 48 x 84 panel edge Ensure panel is flush at top Secure using 2 5 1 cm nails 6 15 2 cm apart on edges and 12 30 5 cm apart on inside of panel Plac...

Page 44: ...nails Fig A 4 3 7 6 cm x16 3 7 6 cm x2 2 5 1 cm x32 RIGHT EAVE WALL INSTALLATION 3 7 6 cm Screws OO 3 Nails into bottom plate D O O R BEGIN Stand right sidewall on floor Center right sidewall assembly...

Page 45: ...tanding your GABLE END WALL FINISH 7 Secure gable wall to floor using 3 nails Fig C Nail gable wall panel to eave wall stud using 1 1 2 nails 6 apart Fig C 4 5 6 6 15 2 cm Flush Fig A Fig B 2 5 1 cm N...

Page 46: ...wall panel to eave wall stud using 1 1 2 nails 6 apart Fig B 5 6 3 ENSURE GABLE AND EAVE WALL PANELS ARE FLUSH BEFORE SECURING 6 15 2 cm Fig B 1 1 2 3 8 cm Nails Fig C BE SURE TOP OF WALL FRAMES ARE F...

Page 47: ...Fig D 7 Secure eave wall bottom plates to floor using 3 nails Fig D Remove temporary braces 8 9 3 7 6 cm 2 5 1 cm x22 or x32 LEFT EAVE WALL INSTALLATION x12 or x16 D O O R 3 7 6 cm Nails 6 15 2 cm Na...

Page 48: ...oor wall on floor It is important to secure the front wall in the following order Fig B 2 5 1 cm Screw 2 5 1 cm Screw Flush Flush Fig A 2 5 1 cm Screw Flush Flush Flush IF YOU CHOSE THE EAVE SIDE WALL...

Page 49: ...o eave wall studs using 1 1 2 nails 6 apart Fig E 2 5 1 cm Nails Angle nail to hit floor frame FINISH 7 4 3 5 6 1 1 2 3 8 cm Nails Fig F 3 7 6 cm Screw Fig E Secure gable door wall top frame 2 x 4 usi...

Page 50: ...d secure using 1 1 2 nails 2 1 BEGIN 3 4 5 Place second RL as shown Place MIDDLE front gable panel flush to installed left panel Ensure panels are flush Secure panel to installed RL using 1 1 2 nails...

Page 51: ...t parts as shown Fig A You will build FOUR assemblies Fig B x8 2 x 3 x 75 1 4 5 1 x 7 6 x 191 1 cm ECA x16 2 x 4 x 4 7 8 5 1 x 10 2 x 12 4 cm CLA 3 7 6 cm x64 Fig B x4 Fig A Flush Flush Flush Flush Fl...

Page 52: ...assemblies as shown Fig E You will build TWO complete assemblies 3 7 6 cm x8 Fig E Fig F x2 Gable Assemblies Flush Flush Flush Flush 3 7 6 cm Screws Attach PVA to ladder assembly using 3 screws Fig F...

Page 53: ...crews toe screwed into RL at an angle as shown in Fig B 3 2 5 1 cm x42 4 Repeat STEPS 1 3 to attach back gable unit On the inside secure gable with two 3 screws toe screwed into RL at an angle as show...

Page 54: ...hing your RAFTERS 4 BEGIN 1 Locate first rafter on top plate Align rafter over studs at each side and tight to side wall Fig A Fig B Rest notch on top plate 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 c...

Page 55: ...ecure with 3 screws Fig C Place rafter spacer PVA on the far side of 5th rafter from LEFT wall Fig A Keep PVA flush to all edges of rafter Fig C Pre drill a 1 8 hole through PVA to avoid splitting Sec...

Page 56: ...ure panel with two 2 5 1 cm nails in the corners 2 Attach a 27 1 4 x 48 roof panel with the rough side up with a 3 4 1 9 cm measurement on the rafter Fig A and flush with the installed panel Fig C Sec...

Page 57: ...8 panel Fig C and flush with the rafter ends Fig B Secure panel with two 2 5 1 cm nails in the corners Secure lower roof panels using 2 nails 6 apart on edges and 12 apart inside panel PARTS REQUIRED...

Page 58: ...side up and flush with the installed 48 x 31 7 8 panel Fig C Ensure 3 4 measurement on the rafter Fig A Secure the lower edge of roof panel using two 2 nails in corners as shown Fig F Move up to the t...

Page 59: ...the rafters Fig G Secure with one 2 nail into each rafter Fig G 2 Nails 2 Nails Two Nails NAIL FIRST Two Nails NAIL FIRST 48 x 47 7 8 4 8 x 3 1 7 8 7 8 3 4 1 9 cm Gauge Block Fig A 24 61 cm 24 61 cm...

Page 60: ...Fig D Secure using twelve 2 finish nails Repeat STEPS 1 2 to attach soffit boards on the opposite side Ensure sof t boards are flush at seam Fig B and flush at peak Fig D x4 3 8 x 7 7 8 x 73 5 16 1 x...

Page 61: ...oard Fig C flush to rafter end Fig B and flush to back gable soffit Fig A Secure using 2 finish nails two in each rafter Toenail at center seam Fig C Repeat STEPS 1 3 to attach eave side soffit boards...

Page 62: ...PS 1 2 to attach fascia boards on the other gable end 3 You have finished installing your gable fascia FINISH 4 1 BEGIN PARTS REQUIRED x2 3 8 x 4 3 4 x 75 7 8 1 x 12 1 x 192 7 cm x2 3 8 x 4 3 4 x 75 7...

Page 63: ...4 x 32 5 8 fascia board with primed side out flush with roof panels Fig A 4 3 4 x 80 5 8 fascia board and gable fascia as shown Secure using 2 finish nails into rafter ends Toenail at center seam Fig...

Page 64: ...rated caulk BEGIN 1 From back side of door position window in opening and ensure square with door edge Use four screws to secure each window 3 2 Lay doors face down on a clean flat surface Apply high...

Page 65: ...Tighten securely Attach temporary support GAA with two 1 5 8 screws as shown Tighten securely OO GAA SPACER Tighten screws securely OFFSET 4 3 7 6 cm Screws Screws 1 1 4 3 cm Bottom edges flush NOTE...

Page 66: ...d floor using ten 3 screws as shown Make sure screws go into framing and floor Fig C D 9 3 7 6 cm Screws into the wall support and floor frame Fig B SEAM Fig C 3 8 1 cm Fig D Angle 3 7 6 cm Screw Atta...

Page 67: ...ng eleven 3 4 special coating screws into floor as shown Fig C 5 You have nished securing your door and trim FINISH 6 BEGIN 1 2 Secure two horizontal door rails AH with four 3 4 screws from behind to...

Page 68: ...door Fig A 1 PARTS REQUIRED x14 2 5 1 cm DOOR STIFFENERS FINISH 4 Repeat Steps 1 2 to install OO on right door 3 Secure using 7 2 screws through outside trim into OO Fig B 2 Fig A Center OO in door op...

Page 69: ...e on outside of right door as shown Fig A Pre drill hole with 1 4 drill 1 3 4 4 4 cm 1 4 Pre drill and 1 2 Drill through Fig A 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit 3 4 1 9 cm x12 You have finished p...

Page 70: ...4 x2 1 1 4 x2 Handle locking with Screws x1 x4 3 4 Tech Screw with drill point 1 1 4 x8 3 Point Door Locking Mechanism RIGHT DOOR Set Screw 1 1 4 Wood Screw Pre drill for screws 1 1 4 Pan Head Screw...

Page 71: ...ng locations of brackets and plates 3 4 Tech Screw Washer Washer UPPER BRACKET with offset Orient bracket as shown Washer Washer Plate 3 4 Tech Screw 1 1 4 Pan Head Screw Orient bracket as shown LOWER...

Page 72: ...70 45o DOOR HARDWARE 2 1 4 2 1 4 TOP of Door RIGHT DOOR LEFT DOOR IMPORTANT This rod to edge of door Make sure rods are straight up and down when locating brackets BOTTOM of Door...

Page 73: ...71 DOOR HARDWARE Align Plates with vertical rod points Drill thru with 3 8 drill bit to 2 depth into header and floor PLATE FRAMING PLATE FLOOR VERTICAL RODS Drill with 3 8 bit to 2 depth...

Page 74: ...STEPS 1 2 to attach trim to all four corners Finish attaching trim flush to corners Fig B using six 2 5 1 cm finish nails as shown You have attached your corner trim 3 2 81 7 8 208 cm 81 7 8 208 cm 8...

Page 75: ...ails 1 BEGIN 2 x36 2 5 1 cm 3 8 x 8 x 12 1 2 1 x 20 3 x 31 8 cm x6 2 x 3 x10 1 8 5 1 x 7 6 x 25 7 cm AE x6 PARTS REQUIRED AE x5 x1 2 5 1 cm Nail Flush Flush Flush 56 142 2 cm LEVEL Corner Stud Left Sh...

Page 76: ...ls at each support as shown 3 FINISH 5 You have finished installing your shelves 4 x28 2 5 1 cm 7 16 x 11 7 8 x 23 7 8 1 1 x 30 2 x 60 6 cm x1 7 16 x 11 7 8 x 96 1 1 x 30 2 x 243 8 cm x1 1 x 4 x 23 7...

Page 77: ...ue RL TP TP Flush Flush Flush 3 7 6 cm Nails x12 RL 2 3 4 5 Assemble joist with 3 nails in a staggered pattern Turn assembled joist over and repeat staggered nail pattern Repeat STEPS 1 3 to assemble...

Page 78: ...cm x2 Pre Assembled Loft Joist 7 8 9 Clamp or hold Pre Assembled Loft Joist in place flush under top plate Drill through joist and wall studs with 7 16 drill bit as shown Secure joist with hex bolts f...

Page 79: ...xceed 400 lbs 181 kg evenly distributed across loft FINISH 11 You have finished installing your Loft 8 20 3cm 2 5 1 cm Nails Flush Flush 10 Install loft panel centered over loft joists Secure with 2 5...

Page 80: ...ur Window Kit for window and trim installation Window Kit 3 7 6 cm x16 x2 From inside measure and mark locations of window framing 2x3 s included in window kit Window framing 2x3 s must be installed f...

Page 81: ...corner of window framing From outside mark straight lines connecting the holes Cut along lines using a saw Carefully trim panel opening after cutting as necessary 3 2 4 You have finished preparing yo...

Page 82: ...ide of shed HINT For best appearance install collar tie on rafter facing away from door opening Position and level another collar tie HJ on sixth rafter from loft side of shed Attach with 2 nails as s...

Page 83: ...vent in the gable wall as shown You have finished installing your vents Secure using 1 2 5 cm screws x2 GABLE VENTS 15021 Repeat STEPS 1 2 to install vent on the opposite gable wall 3 x8 8 x 1 2 5 cm...

Page 84: ...Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED...

Page 85: ...ross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overh...

Page 86: ...oof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 SHINGLES continued Install second row of shingles flush at top of first ro...

Page 87: ...t ridge cut to peak with a utility knife Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from...

Page 88: ...cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 BEGIN 1 2 5 cm 2 5 cm 2 5 cm 2 5 cm...

Page 89: ...between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Page 90: ...olas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola...

Reviews: