Frame Assembly
Phase 9
Phase Notes
• Assemble with hardware as shown.
Parts needed:
• (2) G2 - RAIL - W101678
Hardware needed:
• (12) CK - SCREW PFH 8x2 - H100111
Step 1: Pre-drill & attach 'G2' Rail to 'H5' Rail
Support with Screws 'CK', as shown. (Repeat
process for opposite side assembly.)
G2
CK
CK
CK
H5
G2
H5
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.