Phase Notes
• Assemble with hardware as shown.
Frame Assembly
Phase 10
Parts needed:
• (2) SB1 - PERGOLA SWING BEAM - W101713
• (4) M1 - PERGOLA BEAM - W101693
Hardware needed:
• (4) AB - LAG SCREW WH 5/16x3 - H100029
• (4) AD - WASHER LOCK EXT12x19 - H100031
• (8) BW - SCREW PFH 8x3 - H100092
Step 1: Pre-drill & attach 'SB1' Pergola
Swing Beam to 'H1' & 'H2' Beam Support
using 'AB' Lag Screws and 'AD' Washers,
as shown. (See Diagram for pergola beam
locations.)
AD
AB
SB1
H2
M1
BW
H2
H2
M1
SB1
SB1
H1
Note: It is vital that the fort
be level before and after
each phase of assembly.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
Step 2: Pre-drill & attach 'M1' Pergola
Beam to 'H1' & 'H2' Beam Support using
'BW' Screws, as shown. (See Diagram for
pergola beam locations.)