Swing Assembly
Phase 19
Parts needed:
• (See 'Hardware Needed'.)
Hardware needed:
• (4) CJ - NUT LOCK 5/16 - H100110
• (8) CE - WASHER FLAT 9x18 - H100106
• (4) ME - EYE BOLT - H100159
Phase Notes
• Assemble with hardware as shown.
H9
CE
ME
H16
H15
H11
CJ
CE
Step 1: Attach 'ME' Eye Bolt by inserting
'ME' into Washer 'CE' through 'H16' Swing
Support & Washer 'CE' and secured using
Lock Nut 'CJ', as shown.(Repeat to attach
the eye bolt on the opposite side of the
pergola swing.)
Step 2: Attach 'ME' Eye Bolt by inserting
'ME' into Washer 'CE' through 'H9' Swing
Support & Washer 'CE' and secured using
Lock Nut 'CJ', as shown.(Repeat to attach
the eye bolt on the opposite side of the
pergola swing.)