SHINGLE COURSE - START
START HERE
- 7/8" ROOFING NAIL GALV. - H100446
(8)
NOTE:
START SHINGLES WITH 1/2" OF
OVERHANG OFF THE EDGES OF
THE SHED AND FLUSH WITH THE
STARTER SHINGLES.
FULL - ASPHALT SHINGLE 12 x 36
(1)
1 - ASPHALT SHINGLE 12 x 30
(1)
IMPORTANT NOTE:
SHINGLE #1 STARTS APPROXIMATELY 5 1/4"
ABOVE THE BOTTOM EDGE OF THE PRIOR
SHINGLE.
LEFT SIDE
RIGHT SIDE
•
WORK RIGHT TO LEFT WHEN
INSTALLING SHINGLE COURSES.
FULL
1
Full Rain Slot
5 1/4
Notch
Notch
Tar / Sealing Strip
6 3/4 TO NAILS
Half Rain Slot
NAIL ON TOP EDGE OF SEAL STRIP.
1"
1"
5 1/4
SHINGLE SPACING
NOTE NAIL PLACEMENT:
ONE NAIL ON EACH END
OF SHINGLES AND ONE
NAIL OVER EVERY RAIN
SLOT. USE
DIMENSIONS ABOVE
FOR NAIL LOCATIONS.
•
Familiarize yourself with a 3-Tab Shingle.
SHINGLE NAIL PATTERN
7/8" ROOFING NAIL GALV.
(8 PLCS)
ASPHALT SHINGLE 12 x 30
(1 PLC)
ASPHALT SHINGLE 12 x 36
(1 PLC)
NOTE: SOME NAILS
ARE'NT SHOWN IN
THE FIRST COURSE
IN THIS
PRESENTATION.
PRE-CUTT SHINGLES WILL HAVE A NUMBER STAMPED ON THE
SHINGLE. ARRANGE THESE SHINGLES AS SHOWN TO GET
DESIRED RESULTS. (FULL SHINGLES ARE NOT NUMBERED)
1
NOTE NUMBERS ON SHINGLES.
33
Summary of Contents for READY SHED
Page 18: ......