35
• IF NEEDED BEND EXCESS SHINGLES OVER PEAK BEFORE STARTING ON RIDGE CAPS.
RIDGE CAP INSTALLATION
• INSTALL FIRST RIDGE CAP FLUSH WITH SHINGLES BELOW AS SHOWN.
START AT THE FRONT OF YOUR SHED AND WORK TOWARDS THE REAR.
- RIDGE CAP 12 x 11.875
(17)
- 7/8" ROOFING NAIL GALV. - H100446
(38)
7/8" ROOFING NAIL GALV.
(2 PLCS)
RIDGE CAP 12 x 11.875
(1 PLCS)
ONE NAIL PER SIDE ABOVE WEATHER SEAL.
1
5 1/2
WEATHER SEAL
TOP VIEW
- RIDGE CAP 9.25
(1)
- SHINGLE CAP 5 x 11.625
(1)
FRONT OF SHED.
Summary of Contents for READY SHED
Page 18: ......