FRONT OF SHED.
• Install second ridge cap 5" back as shown.
Repeat this process until you reach the end of the shed.
36
NOTE: NAILS ARE COVERED BY NEW RIDGE CAPS.
5
7/8" ROOFING NAIL GALV.
(2 PLCS)
7/8" ROOFING NAIL GALV.
(2 PLCS)
TOP VIEW
RIDGE CAP 9.25
(1 PLCS)
RIDGE CAP 12 x 11.875
(1 PLCS)
9 1/4
NOTE: THIS IS THE ONLY SHORT 9 1/4"
RIDGE CAP, IT WAS SPECIALLY DESIGNED
FOR THE REAR OF YOUR SHED.
7/8" ROOFING NAIL GALV.
(2 PLS)
FLUSH
USE PROPER ROOF
COATING MATERIAL
AROUND NAILS TO
PREVENT LEAKS.
SHINGLE CAP 5 x 11.625
(1 PLS)
FRONT OF SHED.
• Install last ridge cap 5" back as shown, it should be flush with the back of your
shed.
• Install 5" Cap as shown. It should be flush with the back of your shed and cover up
the nails from the prior step.
RIDGE CAP INSTALLATION
•
You have finished your ridge cap.
REPEAT THIS STEP
(15 TIMES)
Summary of Contents for READY SHED
Page 18: ......