GALAXY® II Gateway Receiver
Figure 15: Bottom of gateway receiver
8 . Remove the M12 cap from the M12 receptacle on the bottom of the network gateway receiver and discard the cap .
9 . Connect the M12 plug connector assembly to the M12 receptacle and tighten the locking ring in a clockwise
direction until finger tight .
10 . Connect the 308 connector on the other end of the power cable to the 308 connector of the AC-to-DC power supply
and snap the anti-tamper collar over the connection .
11 . Connect the power cord to the power supply and then plug the three prong male end of the power cord into a
120V AC power source . The LED indicator above the M12 connection turns on with a steady green light, indicating
the gateway power is on (
Figure 16
) .
NOTE:
N
A red blinking light indicates the gateway is on internal backup battery power . No light indicates the
gateway is not receiving power .
Figure 16: Powered gateway
The M12 connection is complete .
Page 16
February 2014