5
INSTALLATION OVERVIEW
Remove Contents
Take your components
out
of
the
box.
Remove
the
protective packaging. Keep track of all the parts that you
remove from the box. Remove the battery and put it on
charge.
1.
Installation
Once your bike has had any necessary preparation steps
completed, this manual will step through the installation
of each component within the conversion kit.
3.
Ride!
Once
the
battery
is
fully
charged,
you’ve
checked
your
tire pressures and fasteners you’re now ready to go!
5.
Prepare Your bike
Before installing certain components of the kit, your bike
may need some
initial
preparation
such
as
removing
some existing
components. This manual
will
walk
through general guidelines of this bike preparation that
should apply to most bikes.
2.
Tidy Up
After you have installed all of the components needed to
control each part of the kit, it’s now time to tidy up the
wiring harness and make your conversion look nice and
neat.
4.