5
Step 5
Locate the outer panel in its final position. Mark out the floor and drill the finished floor and secure the outer panel
into position using the provided screws.
Pre drilled holes can be found in the base of the panel
Note: Prior to drilling please consider any pre-installed water proofing.
Step 6
Lift the inner bath into position and using a suitable bath trap and connection pipe connect the bath waste to the
preinstalled waste pipe. Once connected lower the bath into the outer panel.
Once satisfied the connection is complete we recommend testing the bath to ensure there are no leaks.
Now the bath is in place, position and plumb in the brassware.