background image

 

 

REPLACEMENT PARTS 

 

Item  Part No. 

Description 

Qty.  Item  Part No. 

Description 

Qty. 

4I-1 

Rubber Rings 

10 

 

Stationary Body 

 

4I-2 

Handle 

11 

4I-11 

Locking Nut and Handle 

4I-3 

Spindle 

12 

4I-12 

BAILEIGH Logo Plate 

4I-4 

Spring Pin 3x24mm 

13 

4I-13 

Spindle Nut  

4I-5 

Spindle Spring 

14 

4I-14 

Hexagon Head Setting Screw 

4I-6 

Spindle Washer 

15 

4I-15 

Plate Rivets 

 

Floating Jaw Body 

 

16 

4I-16 

Base Plate 

4I-8 

Jaw Insert (set of 2) 

17 

4I-17 

Locking Screw 

4I-9 

Jaw Inserts Screws 1/4” – 20 x 
10 

 

 

 

 

*    Standard hardware item available locally. 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for BV-4I

Page 1: ...aintenance Parts lists GENERAL NOTES After receiving your equipment remove the protective container Do a complete visual inspection and if damage is noted photograph it for insurance claims and contac...

Page 2: ...r all costs and expenses associated with returning the Goods to Seller for warranty service In the event of a defect Seller at its sole option shall repair or replace the defective Goods or refund to...

Page 3: ...the state courts sitting in Manitowoc County Wisconsin or the U S Federal Court for the Eastern District of Wisconsin Each party waives any right it may have to assert the doctrine of forum non conven...

Page 4: ...Baileigh does not recommend or endorse making any modifications or alterations to a Baileigh machine Modifications or alterations to a machine may pose a substantial risk of injury to the operator or...

Page 5: ...p them out of reach of children 20 DO NOT operate machine if under the influence of alcohol or drugs Read warning labels on prescriptions If there is any doubt DO NOT operate the machine 21 Keep visit...

Page 6: ...CRIPTION 4 Industrial Bench Vise with Pipe Jaws has a cast iron body and replaceable hardened steel jaws The vise features parallel jaws and pipe jaws Vise will swivel 360 on the base and lock in any...

Page 7: ...with a protective coating This coating should be removed before operation Use penetrating oil to remove protective coating Secure vise in the desire rotational position by hand tightening the lock han...

Page 8: ...Spindle 1 12 4I 12 BAILEIGH Logo Plate 1 4 4I 4 Spring Pin 3x24mm 1 13 4I 13 Spindle Nut 1 5 4I 5 Spindle Spring 1 14 4I 14 Hexagon Head Setting Screw 1 6 4I 6 Spindle Washer 1 15 4I 15 Plate Rivets 4...

Reviews: