19
19
Place the machine on the top of the stand.
•
Using an overhead hoist, lift the machine head.
•
Align and insert the four setscrews (
G
) on the underside of the machine base into the #2 &
#3 gaskets, while lowering the head onto the stand.
•
Secure the machine onto the stand using nuts on the underside of the stand holes.
•
Attach the #1 gasket and drain flange to the head with (2) socket head bolts.
Attach the coolant tank platform.
•
Insert platform (
H
) into the interior of the machine stand.
•
Align the platform holes (
I
) to the screw holes on the
machine stand.
•
Apply an M8 washer to each M8X12 screw and secure the
platform (
H
) to the stand.
Remove the oil fill transport plug from gear transfer case.
•
Use a wrench to unscrew an M20x40 hex screw from the oil fill
hole (
J
).
H
I
G
G G
#1
#2
#3