TRANSPORTING AND LIFTING
Follow these guidelines when lifting with truck or trolley:
•
The lift truck must be able to lift at least 1.5 – 2 times
the machines gross weight.
•
Make sure the machine is balanced. While
transporting, avoid rough or jerky motion, and maintain
a safe clearance zone around the transport area.
•
Use a fork lift with sufficient lifting capacity and forks
that are long enough to reach the complete width of
the machine.
•
Remove the securing bolts that attach the machine to
the pallet.
•
Approaching the machine from the side, lift the machine on the frame taking care that there
are no cables or pipes in the area of the forks.
•
Move the machine to the required position and lower gently to the floor.
•
Level the machine so that all the supporting feet are taking the weight of the machine and no
rocking is taking place.
INSTALLATION
IMPORTANT:
Consider the following when looking for a suitable location to place the machine:
•
Overall weight of the machine including when filters are full.
•
Clearance from walls and other obstacles.
•
Maintain an adequate working area around the machine for safety.
•
Have the work area well illuminated with proper lighting.
•
Keep the floor free of oil and make sure it is not slippery.
•
Remove scrap and waste materials regularly, and make sure the work area is free from
obstructing objects.
•
It is important to maintain free area around the machine, which is required for regular
maintenance.
NOTICE: Lifting and carrying operations should be carried out by skilled workers, such as a
truck operator, crane operator, etc. If a crane is used to lift the machine, attach the lifting
chain carefully, making sure the machine is well balanced.
Summary of Contents for DC-1450C
Page 22: ...20 20 13 All the assembly steps are completed See FIG 10 Fig 10...
Page 26: ...24 24 EXPLODED DIAGRAM...
Page 30: ...28 28 NOTES...
Page 31: ...29 29 NOTES...