13
13
Follow these guidelines when lifting crane or
hoist:
Always lift and carry the machine with the lifting
holes provided at the top of the machine.
Use lift equipment such as straps, chains, capable of
lifting 1.5 to 2 times the weight of the machine.
Take proper precautions for handling and lifting.
Check if the load is properly balanced by lifting it an
inch or two.
Lift the machine, avoiding sudden accelerations or
quick changes of direction.
Locate the machine where it is to be installed, and
lower slowly until it touches the floor.
INSTALLATION
IMPORTANT:
Consider the following when looking for a suitable location to place the machine:
Overall weight of the machine.
Weight of material being processed.
Sizes of material to be processed through the machine.
Space needed for auxiliary stands, work tables, or other machinery.
Clearance from walls and other obstacles.
Maintain an adequate working area around the machine for safety.
Have the work area well illuminated with proper lighting.
Keep the floor free of oil and make sure it is not slippery.
Remove scrap and waste materials regularly, and make sure the work area is free from
obstructing objects.
It is important to maintain free area around the machine, which is required for the working
place. If any long material is machined, it is necessary to have a sufficient room in front of
the machine as well behind it in the places of material input and output.
LEVELING:
The machine should be sited on a level, concrete floor. Provisions for securing it
should be in position prior to placing the machine. The accuracy of any machine depends on
the precise placement of it to the mounting surface.
A
Summary of Contents for IP-2008-HD
Page 28: ...25 25 All measurements are shown below knife Adjustment Dimensions...
Page 42: ...39 39 6 Loosen Nut on motor bracket 7 Remove belt 8 Remove cutterhead pulley...
Page 46: ...43 43...
Page 50: ...47 47 PARTS DIAGRAM...
Page 51: ...48 48...
Page 52: ...49 49...
Page 53: ...50 50...
Page 54: ...51 51...