33
SETTING UP UPON ARRIV
AL
Setting up upon arrival
The following are brief, but not exhaustive,
instructions on how to initially set up your
motorhome when you have arrived at your
destination.
Report to reception for information about the
site rules and carefully select where you wish to
park your motorhome:
The site should be as level as possible, well
drained and away from boggy areas, and
preferably not under or near to trees.
Consider how you will move your motorhome
when you are leaving site; for example on
sloping ground in wet conditions, pitch facing
downhill.
Where possible leave 6 metres (20ft) of free
space around your vehicle.
Levelling Your Motorhome
It is important to site your motorhome level
so as to ensure the correct operation of the
refrigeratior, cooker, microwave etc.
Always use motorhome specific ramps rated for
the weight of your vehicle.
Mains Power Connection
Connect the 230v to the motorhome by
plugging your 3 pin lead into the site supply and
the 230v socket situated on the outside of your
motorhome.
Always test the circuit breaker on the PDU.
Gas Supply
Turn on the gas supply at the cylinder locater
within the gas locker. Turn on all the taps at
the manifold (located in the kitchen)which are
labeled and serve the individual appliances.
Please bear in mind that if there is still some
air in the supply pipes the ignition of gas
equipment may take longer than usual.
Summary of Contents for Approach Advance 615 2017
Page 1: ...OWNER S MANUAL ...
Page 10: ......
Page 25: ......
Page 33: ......
Page 59: ......
Page 134: ......
Page 140: ......
Page 162: ......
Page 176: ...SERVICE MANUAL ...
Page 177: ......
Page 179: ...Motorhome Overview 4 ...
Page 187: ...12 ...
Page 188: ...13 ...