INTRODUCTION
I-E96-425A
3 - 1
SECTION 3 - MAINTENANCE
INTRODUCTION
The NIAC03 Analog Input Calibration Module requires limited
maintenance. This section contains a maintenance schedule.
MAINTENANCE SCHEDULE
Execute the tasks in Table
at the specified intervals.
Table 3-1. Maintenance Schedule
Task
Interval
Clean and tighten all power and
grounding connections.
Every 6 months or during plant shut-
down, whichever occurs first.
Use a static safe vacuum cleaner to
remove dust from:
Field Termination Panel
Termination Units