35
1-1/2
8
1/4
3-5/8
7/8
1/4
1. PARTS INCLUDED
1-1 Skirt
1-2
Toe kick
1-3 Crossbar
1-4
LED-cover (Required only for bath
with chromatherapy).
2-2
2-3
Length of Bath
1-1
1-2
1-3
1-4
3
x
2. INSTALLATION
3
x
2-1
Holding a level against the side of the
bath, trace a vertical guideline on both
walls.
2-2
Adjust length of the 3 crossbars with
the 4 screws at one crossbar end.
2-3
Fasten the 3 crossbars at the indicated
dimensions using screws. Upper cross-
bar is positioned from the bottom of
the ledge of the bath, and lower cross-
bar is positionned from the floor.
2-1
SKIRTS INSTALLATION |
OWNER’S MANUAL
www.bainultra.com
Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.
MULTIFIT SKIRT
(ADJUSTABLE)