background image

50  

 

Water Level

 

 

AromaCloud

®

 

Turned On

(Lid Open)

AromaCloud

®

 

Turned Off

(Lid Closed)

Water Level

 WARNING

   Avoid using products that contain dyes, food coloring or other coloring agents, this will stain  

or damage the acrylic surface of your bath. Always read the manufacturer’s specific instructions 

before adding to bathing water. Any use of a product containing methyl salicy-late, such as  

Wintergreen oil, is prohibited.

1 800 463.2187 

 

Monday to Thursday from 8 a.m. to 6 p.m.  (EST) . Friday from 8 a.m. to 5 p.m. (EST)  

Printed in Canada. Copyright © June 2020 BainUltra Inc. All rights reserved. 45200001

OWNER’S MANUAL

 |

  

AROMACLOUD

®

  

AROMACLOUD

®

 

USER GUIDE

MAINTENANCE / RECOMMENDATIONS

AromaCloud technology transforms liquid into 

vapor made up of microdroplets that travel 

through the air. It is thus crucial to use only 

quality water and essential oils. Hard, rusty, 

sulfurous or otherwise impure water may 

compromise AromaCloud performance and 

therapeutic benefits.
Essential oils must always be mixed with wa-

ter in the AromaCloud housing. 
One or two droplets are enough for a 30 min-

ute session. If essential oil droplets are spilled 

directly onto the acrylic of your bath or the 

AromaCloud lid or housing, wipe off immedi-

ately. 
When stored correctly, quality essential oils 

have a shelf life of several years without losing 

their properties. Always store essential oils in 

a cool, dark place to prevent oxidation.
Once your aromatherapy session is complete, 

soak up the water remaining in the housing 

using the sponge supplied with AromaCloud, 

to prevent it from eventually stagnating. Never 

use this sponge to clean the bath or on any 

other surface. The sponge should not be used 

to fill up your AromaCloud.

AROMACLOUD

®

 ON/OFF

To turn on AromaCloud, lift the lid, pour water 

into the housing until it reaches the recom-

mended level, add one or two drops of essential 

oils. Read carefully the recommendations below. 

Give the lid a half turn and then lower it again.
To turn AromaCloud off, give the lid a half turn.

SECURITY / PREVENTION

• If the seal is broken, do not use product.
• Do not drink essential oils.
• Always keep essential oils out of reach of children. 
•  Do not expose the nose, eyes, or anal or genital mu-

cous membranes.

• If an allergic reaction occurs, discontinue use.
•  Avoid contact with eyes. If accidental contact occurs, 

carefully apply vegetable oil with a cotton swab. Do 

not rinse with water. Consult a physician immediately.

 WARNINGS  

•  Essential oils contain active ingredients with high concentrations. Please consult an aroma-

therapist or a health specialist before using a new essential oil.

 

  •  Some essential oils may damage permanently the AromaCloud plastic. Avoid using dermocaustic 

essential oils (cloves, thyme, oregano, etc.), citrus based essential oils, and colored essential oils.

Summary of Contents for AMMA BALNEO

Page 1: ...the installer and the owner INCLUDED THERMOMASSEUR INSTALLATION USING THE MIA MIA PLUS CONTROLS Bath with air jets OR DOT CONTROLS Bath without air jets IMPORTANT TO BE KEPT BY THE OWNER REGISTER YOUR WARRANTY ONLINE www bainultra com warranty ...

Page 2: ......

Page 3: ...N 15 INSTALLATION 16 BALNEO NAOS SANOS INSTALLATION 17 18 BALNEO CELLA INSTALLATION 19 TURBINE WITH GEYSAIR TECHNICAL SPECIFICATIONS 20 ELECTRICAL INSTALLATION PLUMBING 21 TURBINE WITH GEYSAIR AROMACLOUD ELECTRICAL INSTALLATION 22 23 REMOTE MOUNTING INSTALLATION 24 25 ELECTRICAL INSTALLATION FOR BATHS without air jet system 26 SKIRTS INSTALLATION GENERAL INSTRUCTIONS 27 PARTS TOOLS 28 SJ1 29 30 SJ...

Page 4: ...tact with electrical components turbine and power module For indoor use only ELECTRICAL CONNECTIONS Never drop or insert objects into any openings The ThermoMasseur must be connected only to a supply circuit that is protected by a 20 amp class A ground fault circuit interrupter GFCI Optional therapies such as Chromatherapy and or 2nd heated backrest and or WarmTouchShell and or AromaCloud must be ...

Page 5: ...ting installation ensure that parts received match your order For all questions call BainUltra at 1 800 463 2187 A 10 Drill A 11 11 64 drill bit A 12 82 routing bit A 13 Screws A 14 Appropriate screwdriver A PARTS AND TOOLS TILE FLANGE INSTALLATION MOLDED TILE FLANGE INSTALLATION SKIRT INSTALLATION OTHER NECESSARY ITEMS See skirt section Wood shims Silicone A 7 Miter box angle cutter A 8 Fine toot...

Page 6: ... of air It will eventually fail and void its warranty A 20 Amp GFCI 12AWG 120V dedicated line is needed for the turbine GeysAir is powered by the turbine If you have additional options on the bath one or more a second dedicated line is needed 15 Amp GFCI 120V 14AWG See page 24 for detailed instructions FAUCET INSTALLATION See the manufacturer s technical specifications for faucets location and pla...

Page 7: ... require a proper conduit for high voltage wires if installed in a cement slab for example The Geysair must be connected to the same hot water line as the bathtub faucets It uses a 3 8 compression thread LED CHROMATHERAPY The power modules inMix module Litestreme have to be installed next to the turbine The wires should run from the back of the bathtub to the turbine location LED Low voltage for t...

Page 8: ...If decking around the ThermoMasseur is level the bath will drain accordingly 1 ALCOVE INSTALLATION BETWEEN 2 OR 3 WALLS Install to permit access for servicing The following instructions apply to both rectangular and corner baths 1 1 Place level lengthwise on decking of the ThermoMasseur and adjust by placing shims under ThermoMasseur where necessary Repeat exercise width wise on the bath Glue shim...

Page 9: ... the skirt may be inserted under the deck THERMOMASSEUR INSTALLATION 1 ALCOVE INSTALLATION BETWEEN 2 OR 3 WALLS cont d 1 6 To finish the front of the bath with ceramic tile or other materials a 2 x 3 5 cm x 7 6 cm structure is necessary to support the Thermo Masseur Place underneath the deck A or the edge of the bath B depend ing on the desired finish 1 7 BainUltra skirt installation requires a si...

Page 10: ...lded tile flange secure the flange to the wall while supporting from beneath Factory or customer installed tile flange No tile flange IMPORTANT A factory installed tile flange does not replace a silicone joint between tiling and the ThermoMasseur The surfaces that come into contact with double sided tape must be cleaned 2 1 Using a miter box angle cutter and a fine tooth saw cut 3 pieces of tile f...

Page 11: ...acrylic To avoid drilling in an air intake zone or an electric component always check under deck before drilling Drill openings slightly larger than actual faucet size This is to avoid any possible cracking or other damage to the acrylic When installing faucets do not over tighten fittings as this may damage the acrylic This type of damage is not covered by the warranty Drill at medium speed and d...

Page 12: ... connect the plumbing and turbine 1 2 Build the 2 x 3 wooden structure taking into account the thickness of the ceramic tiles and the plywood as well as the height of the bath NOTE Plan air intake for turbine 1 3 Secure plywood into place with screws around and above structure 1 4 Cut inside 1 1 2 of the outside dimen sions of the tub 1 5 Ensure bath is levelled and that it fits properly in cutout...

Page 13: ...sseur is level the bath will drain accordingly THERMOMASSEUR PLUMBING INSTALLATION Detail A 1 1 Prepare the site to connect the plumbing and turbine 1 2 Build the 2 x 3 levelled wooden structure with plywood as in Detail A taking into account the thickness of the ceramic tiles and the plywood as well as the height of the bath NOTE Plan air intake for turbine 1 3 Ensure bath is levelled NOTE Protec...

Page 14: ...llation ensure that parts received match the order For all questions call BainUltra at 1 800 463 2187 Instructions in this section apply to Amma freestanding models Refer to ThermoMasseur instructions for the installation of Amma drop in models A 1 Pipe concealer Cella model A 2 Screws and washers Cella and Amma models A 3 Floor anchoring Naos and Sanos A 4 Template Amma models B TOOLS REQUIRED B ...

Page 15: ...cordingly The Amma model requires a 12 x 9 30 5 cm x 22 9 cm recess for the drain Refer to the bath template for the locations of water sup ply electrical connection and control cable and remote air supply if applicable SERVICE ACCESS AND VENTILATION For models in the Balneo series the turbine is not installed on the ThermoMasseur Determine a suitable place close to the bath must be less than 15 4...

Page 16: ...he drain is properly measured 1 3 Use a 3 16 bit to drill anchor screw entry points 2 1 Mount drain on bath Ensure water tightness 2 2 Position the bath aligning anchor holes with anchor screw entry points 2 3 Connect bath drain and water supply and complete electrical wiring 2 4 For Geysair equipped baths the Gey sair unit must be connected to the hot water supply with a 3 8 male compres sion or ...

Page 17: ...bath with an erasable marker 1 2 Remove the ThermoMasseur and care fully place it upside down on a blanket or corrugated cardboard ex the box in which it was delivered 1 3 On the floor determine by referring to measurements taken underneath the bath the exact location of the drain the air pipe and the two anchoring points at each end of the bath 2 1 Install the drain and overflow set on the bath a...

Page 18: ...URBINE section NOTES Since these models sit directly on the floor the overflow drain pipe opening is factory drilled To install the Naos or Sanos on a concrete slab with no access below for air entry to the bath a hole of 1 5 8 inch 4 1 cm in diameter must be drilled into the bath skirt to allow air supply to the bath IMPORTANT Do not drill above height of existing hole in the skirt intended to co...

Page 19: ...a 3 16 drill bit and the drain and air intake openings with a 2 hole saw WARNING Balneo baths cannot be drilled for faucet installation Faucets must be freestanding or wall mounted models 2 1 Install the drain and overflow set on the bath and the first section of the air intake pipe 1 1 2 ABS under the floor Cover the ABS pipe with pipe con cealer included For Geysair equipped baths also run the w...

Page 20: ... TECHNICAL SPECIFICATIONS NOTES The specifications shown indicate the outer edge dimension The manufacturer accepts a 1 4 0 64 cm variance There are variations on each product and specifications are subject to change as we improve upon our product as required The dimen sions needed for site preparation and structure building will differ BainUltra assumes no responsibility for preparatory work done...

Page 21: ... rust sulfur etc the homeowner should al ready be aware of the specific measures that should be taken for all his other appliances using water The Geysair does not need other measures than that GROUNDING The electrical system must be connected to an independent circuit protected by a new 20 AMP Class A ground fault circuit interrupter GFCI and another one of 15 AMP for additonal op tions This elec...

Page 22: ...c cordance with all local provincial state and federal building electrical codes and regulations Connect electrical power supply only after all low voltage wiring is properly installed on turbine If you did not follow this last step shut off and then restart your home s circuit breaker Turbine and air pipe should be clear of building materials and wiring NOTE Connections may differ depending on th...

Page 23: ...otected by patents ELECTRICAL DIAGRAM TURBINE GEYSAIR WITH AROMACLOUD Electrical connections for Canada only 15A CIRCUIT 20A CIRCUIT NEUTRAL N L LOAD NEUTRAL N L LOAD GROUND FAULT CIRCUIT INTERRUPTERS JUNCTION BOX AIRSTREME HEATED BACKREST HEADREST TURBINE GEYSAIR FOR MIA MIAPLUS INMIX MODULE CHROMATHERAPY AROMACLOUD N L N L N L N L TURBINE WITH GEYSAIR AROMACLOUD ELECTRICAL INSTALLATION ...

Page 24: ... air heater of the double heated backrest of the Amma serie and air entry on the bath which are secured in place with screws The turbine must be mounted at least 4 10 cm from the floor To reduce heat loss use insulating material along the entire air line Bath is delivered with a 15 ft 5 m cord to connect the electronic control to the turbine If neces sary extensions are available through a retaile...

Page 25: ... pipes as necessary to connect turbine to bath Follow all relocation instruc tions provided at p 24 of the present Owner s Manual To reduce vibrations avoid having air line pipes touch home structure B 3 Secure pipe at air output of turbine by drilling a 1 8 0 3 cm hole and by using 1 2 1 3 cm sc rew Do not glue B 4 Add an electrical cable extension specific to Geysair available at BainUltra betwe...

Page 26: ...utlet must be installed by a certified electrician Installation must be conducted in accordance with all local provincial state and federal building electrical codes and regulations Connect electrical power supply only after all low voltage wiring is properly installed If you did not follow this last step shut off and then restart your home s circuit breaker NOTE Connections may differ depending o...

Page 27: ...nd the bath bottom is flush with the floor SIZING ACRYLIC PARTS Depending on wall finish you may need to size the panels and toe kicks When installation instructions of specific skirt model mention siz ing of acrylic parts if such sizing is necessary follow these steps PEEL COAT A plastic film peel coat protects the acrylic parts It is best to leave this film in place while working Only remove it ...

Page 28: ...served 45200001 SKIRTS INSTALLATION PARTS AND TOOLS You will require the pencil and level used for the installation of the ThermoMasseur as well as the following items depending on the skirt you are installing A NECESSARY TOOLS AND PARTS REQUIRED NOT INCLUDED FOR ALL MODELS A 1 Measuring tape A 2 Screwdriver Silicone FOR TRIMMING IF NEEDED A 3 Adhesive tape A 4 Jigsaw and finishing blade SJ 1 MODE...

Page 29: ...oducts specifications and services mentioned in this manual are described in pending patent applications or are protected by patents SJ 1 2 INSTALLATION 1 PARTS INCLUDED 1 1 Center panel 1 2 Retainer clips 1 3 8 x 1 2 screws 1 4 Wood blocks if necessary NOTE Parts may vary depending on bath model NOTE If wood blocks are already installed on the bath go to step 2 2 2 1 Glue wood blocks 1 4 0 6 cm f...

Page 30: ... a guideline on both walls 2 3 Trace a line on the floor to connect both lines 2 4 Install the retainer clips on the wood blocks and secure in place with 8 x 1 2 screws 2 5 Fasten two wood blocks to the floor 14 35 6 cm from the center of the bath Space them 2 1 2 6 4 cm from the floor guideline 2 6 Insert top of panel between the bath rim and retainer clips under the bath ledge 2 7 Fasten skirt t...

Page 31: ...ntioned in this manual are described in pending patent applications or are protected by patents 1 PARTS INCLUDED 2 INSTALLATION SJ 3 SE 1 1 Left panel 1 2 Center panel 1 3 Right panel 1 4 Left toe kick 1 5 Center toe kick 1 6 Right toe kick 1 7 Retainer clips 1 8 8 x 1 2 screws 1 9 Wood blocks if necessary NOTE If wood blocks are already installed on the bath go to step 2 2 2 1 Glue wood blocks 1 ...

Page 32: ...here the toe kick will be 2 4 Join the second set of dashes togeth er This will reproduce the bath s curve 2 5 Mark the center of this curve 2 6 Position center toe kick just behind the curved line and center it by aligning the notch under it with the guideline on the floor 2 7 Screw center toe kick to floor starting with the two screws in the middle NOTE You may have to bend the toe kick slightly...

Page 33: ...s on toe kick and adjust screws so that brackets are vertical 2 12 Adjust panel height leaving 1 4 0 6 cm between the edge of the bath and the curved panel top 2 13 Ensure brackets are well seated on toe kick and tighten wing nut as much as possible 2 14 Remove panel and follow steps 2 10 to 2 13 for the left panel 2 15 Remove left panel and repeat steps 2 10 to 2 13 with the center panel 2 16 Lea...

Page 34: ... to 6 p m EST Friday from 8 a m to 5 p m EST Printed in Canada Copyright June 2020 BainUltra Inc All rights reserved 45200001 1 INCLUDED PARTS 2 INSTALLATION MERIDIAN DUO SKIRT INSTALLATION 2 1 Put together the skirt by aligning the velcros provided for this purpose 1 1 Meridian Duo skirt 1 2 Meridian Duo bath ...

Page 35: ...s 2 2 Adjust length of the 3 crossbars with the 4 screws at one crossbar end 2 3 Fasten the 3 crossbars at the indicated dimensions using screws Upper cross bar is positioned from the bottom of the ledge of the bath and lower cross bar is positionned from the floor 2 1 SKIRTS INSTALLATION OWNER S MANUAL www bainultra com Some products specifications and services mentioned in this manual are descri...

Page 36: ...needed install LED covers using silicone or sealant to prevent light from reflecting through the skirt 2 7 Skirt cutting area If the skirt must be cut in height it is important to cut only at the bottom while taking care of repositioning the protection pads OWNER S MANUAL SKIRTS INSTALLATION 1 800 463 2187 Monday to Thursday from 8 a m to 6 p m EST Friday from 8 a m to 5 p m EST Printed in Canada ...

Page 37: ...ne bead to secure it LOCATION 1 Push wiring through drilled holes 2 Remove protective film from watertight seal 3 Secure touchpad into place on either the podium or the wall by using the nut supplied 4 Tighten sufficiently to insure seal is airtight REQUIRED TOOLS INSTALLING THE TOUCHPAD www bainultra com Some products specifications and services mentioned in this manual are described in pending p...

Page 38: ...nge Red SCAN mode Scans through colors continuously PAUSE Stops on a selected color during the SCAN mode Press and hold for 2 to 3 seconds TURN OFF No LED light appears on DOT control when Chromatherapy is in function OPERATING WTS DOT OPERATING CHROMA DOT 1 800 463 2187 Monday to Thursday from 8 a m to 6 p m EST Friday from 8 a m to 5 p m EST Printed in Canada Copyright June 2020 BainUltra Inc Al...

Page 39: ...ck under the deck before drill ing If you have to install the control to the wall remove the mounting bracket wing nuts and the protective film of sticker behind the control You can add a silicone bead to secure it DRILLING Refer to the drilling template on the last page for the location and diameter of the holes 1 Push wiring through drilled holes 2 Remove protective film from watertight seal 3 S...

Page 40: ...for the heated backrest is controlled simultaneously with the intensity of the jet pressure ON OFF This function completely drains the conduits and dries them for 90 seconds regardless of whether or not the system was activated By eliminating any water left in the conduits the Drying cycle ensures perfect hygiene No stagnant water No water left over from the previous bath To activate the Drying cy...

Page 41: ... in use Adjust screen contrast Select display language KEYS AND FUNCTIONS Press this key to start or to stop the turbine and the MiaPlus control panel Press this key to return to function adjust ment The Massage function appears on the screen by default Press either of these keys to navigate the main menu of the MiaPlus control panel Press the key to see the next function Functions are displayed i...

Page 42: ...personalized comfort and a remarkably effective Hydro thermo massage The default pressure is the same as the previous bath Increase or decrease the pressure of the air jets by repeatedly pressing the or key until the desired pressure is reached Pressure increases in 10 increments Pressing is optional This function lets you program the duration of your bath from 5 to 30 minutes The selected duratio...

Page 43: ...key to return to the basic Massage screen For maximum relaxation and exceptional comfort one or two heated backrests can be installed in your bath and heated individually Select the Backrest function by pressing the key until the Backrest function is displayed Four options are available Off Low Medium High NOTE Models with 2 backrests will specify backrest 1 and backrest 2 Choose the desired optio...

Page 44: ...to maximum desired intensity Bather 1 2 3 4 Stores each bather s selection Use the or keys to select an option Press to validate your choice Use the arrows or or the key to return to the basic Massage screen The MiaPlus control system lets you save up to four personalized presets This save func tion lets you conveniently preselect settings adapted to various users or purposes Simply set the functi...

Page 45: ...ns are available After Bath Daily Even when the daily drying cycle is pro grammed the automatic drying cycle will activate after each use Select After Bath The After Bath option lets you program the Drying cycle to start up to 60 minutes after a bath To select the After Bath option press the key on the menu until the Drying cycle function appears Use the and keys to select the After Bath option Pr...

Page 46: ...rying cycle option appears Use the and keys to select the Daily op tion Press Start Time is displayed Use the or keys to select the time of day the Drying cycle function should start Press Actual Time is displayed Press and hold the or keys or press them repeatedly to set the preprogrammed current time in 10 minute slots Press Once the Daily option is set the Drying cycle will start every day at t...

Page 47: ...ppears Use the or keys to select the Activate option Press to validate your choice When you stop the bath the Lock function locks the key making it impossible to restart the turbine To restart the turbine when the Lock function is activated Press the key Lock is displayed Press The turbine starts To deactivate the Lock function Press the key on the menu until the Lock function appears Use the and ...

Page 48: ...ess the or key on the menu until the Contrast function appears NOTE Use the key to access this function more quickly when you start the turbine Press or until the desired percentage of contrast is displayed Press to validate your choice Use the arrows or or the key to return to the basic Massage screen The MiaPlus control system lets you select one of the following three display languages French E...

Page 49: ... of tiling flange and bath skirt if present The desired direction with respect to the bath and the room entrance The possibility that the tub support structure will require an additional cutout to house Aro maCloud Note that factory installation by BainUltra will always be performed for freestanding baths whose decking has been modified to house AromaCloud 1 Jigsaw with finishing blade 2 Drill 3 1...

Page 50: ...veral years without losing their properties Always store essential oils in a cool dark place to prevent oxidation Once your aromatherapy session is complete soak up the water remaining in the housing using the sponge supplied with AromaCloud to prevent it from eventually stagnating Never use this sponge to clean the bath or on any other surface The sponge should not be used to fill up your AromaCl...

Page 51: ...rylic as well as the efficiency of its system along with the exceptional quality of care offered by your BainUltra bath Table Sandpaper grade Égratignure Papier grade 220 Papier grade 400 Papier grade 600 Papier grade 800 Papier grade 1200 Polissage Scratch Paper grade 220 Paper grade 400 Paper grade 600 Paper grade 800 Paper grade 1200 Polish Technical information All BainUltra ThermoMasseurs are...

Page 52: ... Brite pad 7447 available at hardware stores Do the same for surface scratches or for any stain that could not be removed with a cleaning sponge For the use of any product other than those mentioned in this document first make a test on a small less visible surface before completely cleaning the bathtub If in doubt please contact our technical service ACRYLIC DEEPER SCRATCHES ACRYLIC ULTRA VELOUR ...

Page 53: ...to clean the soiled area In most cases a little soapy water or mild detergent dishwashing is sufficient For stubborn stains a mixture of water and vinegar or isopropyl alcohol can be used The main manufacturers of quartz panels recom mend the use of specialized liquid cleaning products such as Method Daily Granite or Bar Keepers Friend available in most large scale hardware stores Residues stuck o...

Page 54: ...t be new Turbine and air heater are equipped with heat sensors designed to cut off power in case of overheating Insuffi cient air circulation may be the cause Make sure turbine has sufficient ventilation Make sure turbine intake is not obstructed To meet everyone s needs particularly those of children your bath is designed to work at a very low speed Air jets in half seat when applicable or those ...

Page 55: ...he bath there is absolutely no risk to the system After 3 to 5 minutes the heated back rest or backrests should be warm to the touch and jets should also seem warm when you bring your hands close to them Check the turbine air intake It should not be too cold nor too warm Ideally the temperature should be between 72 F 20 C and 86 F 30 C Check that distance between turbine and bath is not too great ...

Page 56: ... Shut off and restart breaker Check connections in the bath junction box Canada only Check that there is water in the unit and it is filled to the recommended level Make sure the water is clean and free of suspended particles limestone rust etc Check that the lid is correctly positionned on the housing Make sure breaker is on Shut off and restart breaker Check connections in the bath junction box ...

Page 57: ...ther representative of BainUltra or iii the unit is installed outdoors or has not been installed in accordance with BainUltra s instructions or in compliance with local codes and ordinances Because of their organic nature wood components will expand and contract with seasonal changes and normal heating variations With time normal exposure to sunlight will slightly alter the wood tint These changes...

Page 58: ......

Page 59: ...88 4 3 cm Hole Contour Control Contour www bainultra com Some products specifications and services mentioned in this manual are described in pending patent applications or are protected by patents DRILLING TEMPLATES OWNER S MANUAL IMPORTANT Drawing is to scale MIA DRILLING TEMPLATES DRAWING OF MIA CONTROL HOLE ...

Page 60: ......

Page 61: ...e Contour Control Contour www bainultra com Some products specifications and services mentioned in this manual are described in pending patent applications or are protected by patents DRILLING TEMPLATES OWNER S MANUAL MIAPLUS DRILLING TEMPLATES IMPORTANT Drawing is to scale DRAWING OF MiaPlus CONTROL HOLE ...

Page 62: ......

Page 63: ...ling flange if present The desired direction with respect to the bath and the room entrance Notes AromaCloud must be installed on bath decking After drilling verify that there is a 1 16 inch gap between the hole and the AromaCloud housing Choose a position for Aroma Cloud on the bath Place the adhesive masking paper over the area of the bath where AromaCloud will be installed to protect the acryli...

Reviews: