background image

ESSENCIA DROP-IN - installation

1 800 463.2187 

 

Monday to Thursday from 8 a.m. to 8 p.m.  (EST) . Friday from 8 a.m. to 5 p.m. (EST)  

Printed in Canada. Copyright © April 2017 BainUltra Inc. All rights reserved. 

45200653

ESSENCIA

® 

 COLLECTION - DROP-IN MODELS

INSTALLATION INSTRUCTIONS 

TABLE OF CONTENT

IMPORTANT SAFETY INSTRUCTIONS .....................................................................................................................1

PARTS & TOOLS ...................................................................................................................................................3

SITE PREPARATION  .............................................................................................................................................5

INSTALLATION

 

• DROP-IN WITH 

REMOTE  MOUNTING OF TURBINE 

– ESSENCIA OVAL 7236 & DESIGN 7438

 ...........................7

 

• DROP-IN WITH 

FACTORY INSTALLED TURBINE 

– ESSENCIA OVAL 7236

 ......................................................14

 

•UNDERMOUNT WITH 

REMOTE  MOUNTING OF TURBINE 

– ESSENCIA DESIGN 7438

 ....................................15 

CUTTING TEMPLATES • 

ELECTRONIC CONTROLS

 ..........................

ESSENCIA - INSTALLATION INSTRUCTIONS Manual

 page 34

Summary of Contents for ESSENCIA DESIGN 7438

Page 1: ...N 7438 INSTALLATION INSTRUCTIONS ADDENDUM to ESSENCIA INSTALLATION INSTRUCTIONS IMPORTANT INFORMATION FOR THE INSTALLER AND THE OWNER This document should always be accompanied by the ESSENCIA INSTALLATION INSTRUCTIONS T O BE KEPT BY THE OWNER ...

Page 2: ...ON DROP IN MODELS INSTALLATION INSTRUCTIONS TABLE OF CONTENT IMPORTANT SAFETY INSTRUCTIONS 1 PARTS TOOLS 3 SITE PREPARATION 5 INSTALLATION DROP IN WITH REMOTE MOUNTING OF TURBINE ESSENCIA OVAL 7236 DESIGN 7438 7 DROP IN WITH FACTORY INSTALLED TURBINE ESSENCIA OVAL 7236 14 UNDERMOUNT WITH REMOTE MOUNTING OF TURBINE ESSENCIA DESIGN 7438 15 CUTTING TEMPLATES ELECTRONIC CONTROLS ESSENCIA INSTALLATION ...

Page 3: ...se drugs or alcohol before or during the use of a Hydro thermo massage bathtub equipped with a heater Use this unit only for its intended purposes or as described in this manual Use only accessories or devices recommended by the manufacturer Risk of hyperthermia and possible drowning Check and adjust water temperature before use Water temperature exceeding 100ºF 38ºC may be injurious to your healt...

Page 4: ...F 90ºC Canada only for permanently connected units A green colored terminal or a wire connector marked g gr ground or grounding is provided within the terminal compartment not applicable if unit supplied with an electric plug To reduce the risk of electrocution connect this terminal or connector to the grounding terminal of your electric service or supply panel with conductor equivalent in size to...

Page 5: ...ing nut 1 C Strainer 1 D Rubber seal 1 E PVC Wired drain shoe 1 F PVC Piping 1 1 2 x2 1 G PVC Tee Connector 1 1 2 F F 1 DESCRIPTION QTY H Plated drain clicker 1 I Strainer 1 J Rubber seal 1 K Brass drain shoe 1 L 4 in brass tailpiece 1 M Nylon conic shaped seal for drain 1 N Brass nut 2 O Brass pipe 1 1 2 x3 with flange 1 P Nylon flat seal with flange 1 Q 1 1 2 male threaded adaptor 1 1 Integrated...

Page 6: ... ESSENCIA COLLECTION DROP IN MODELS INSTALLATION INSTRUCTIONS B C D A PARTS TOOLS REQUIRED STANDARD PARTS THERMOMASSEUR DESCRIPTION QTY A Turbine 1 B MiaPlus Control Design 7438 1 C MiaMulti Control Oval 7236 1 D 15 extension cord 1 PARTS TOOLS REQUIRED Installation template 48 inch level Measuring tape Teflon tape Caulking gun Silicone ABS PVC Glue Square Phillips 2 Screwdriver 3 4 Ratchet Adjust...

Page 7: ...derneath the bath can support 1500 lb 680 kg The bath may sit directly on the floor The bathtub can also sit on a concrete bed In that case it is recommended to isolate the concrete between two plastic sheets one installed on the floor and the other under the bath SERVICE ACCESS AND VENTILATION A service access is necessary Minimum dimensions are 22 x18 55cmx46cm to properly reach all electrical c...

Page 8: ...0653 ESSENCIA COLLECTION DROP IN MODELS INSTALLATION INSTRUCTIONS PLUMBING INTALLATION TEMPLATES FLOOR LAYOUT FOR PIPES AND ACCESS ESSENCIA OVAL 7236 ESSENCIA DESIGN 7438 DROP IN INSTALLATION WITH REMOTE MOUNTING OF TURBINE ESSENCIA OVAL 7236 DESIGN 7438 NOTE Please refer to the Installation Template provided with your ESSENCIA bath However if it is missing please contact us at 1 800 463 2187 to o...

Page 9: ...tent applications or are protected by patents ESSENCIA COLLECTION DROP IN MODELS INSTALLATION INSTRUCTIONS 1 PLUMBING ESSENCIA OVAL 7236 Assembly of the waste overflow DROP IN INSTALLATION WITH REMOTE MOUNTING OF TURBINE ESSENCIA OVAL 7236 DESIGN 7438 WARNING Refer to manufacturer s instructions supplied with packaging of components for final assembly ...

Page 10: ...il 2017 BainUltra Inc All rights reserved 45200653 ESSENCIA COLLECTION DROP IN MODELS INSTALLATION INSTRUCTIONS DROP IN INSTALLATION WITH REMOTE MOUNTING OF TURBINE ESSENCIA OVAL 7236 DESIGN 7438 1 PLUMBING ESSENCIA DESIGN 7438 Assembly of the waste overflow WARNING Refer to manufacturer s instructions supplied with packaging of components for final assembly ...

Page 11: ...e installation template DROP IN INSTALLATION WITH REMOTE MOUNTING OF TURBINE ESSENCIA OVAL 7236 DESIGN 7438 Box Structure Installation Template IF NEEDED make an opening of sufficient dimension in the panel to allow air electrical plumbing connections access according to dimensions on installation template Build the wooden box structure 2 x3 or better taking into account the thickness plywood fini...

Page 12: ... 1 16 0 2cm considering the thickness of the glue of the finishing Adjust the height of the bath to the floor if necessary The bath is molded with a slope towards the drain If the bathtub is levelled according to bath deck surface the water will drain completely 2 DROP IN CONSTRUCTION cont d Fix INTERMEDIATE panels plywood recommended on the sides and at the top Check the bath level with the groun...

Page 13: ...drawn on the installation template at 1 2 5 cm from the outside edge of the bath area Keep an access to perform electrical plumbing connections Keep minimum 22 x18 55cmx46cm access to perform electrical plumbing connections and facilitate repairs An air intake of at least 2 x4 5cm x10cm is necessary to ensure proper functioning of the turbine WARNING Once the bath is placed on the floor it is reco...

Page 14: ...e bath during installation Connect the drain Perform a leak test before completing the box installation Once the bath is placed on the floor it is recommended to leave a clearance of 1 16 0 2cm between the deck surface of the bath and the top of the box Apply a bead of silicone on the contour of the bath to make sure the top of the box is sealed FOR NEXT STEPS PLEASE REFER TO THE ESSENCIA INSTALLA...

Page 15: ...A OVAL 7236 DESIGN 7438 5 ELECTRONIC CONTROL INSTALLATION MIAPLUS DESIGN 7438 MIAMULTI OVAL 7236 PAGE 15 6 REMOTE MOUNTING OF TURBINE PAGE16 7 REMOTE MOUNTING OF TURBINE AIR PIPE THERMOMASSEUR PAGE 17 7 REMOTE MOUNTING OF TURBINE ELECTRICAL CONNECTIONS THERMOMASSEUR PAGE17 8 REMOTE MOUNTING OF TURBINE ELECTRICAL CONNECTIONS OF OPTIONAL THERAPIES PAGE 18 8 REMOTE MOUNTING OF OPTIONAL THERAPIES TUB ...

Page 16: ...N MODELS INSTALLATION INSTRUCTIONS DROP IN INSTALLATION WITH FACTORY INSTALLED TURBINE ESSENCIA OVAL 7236 A Turbine B WarmTouchShell C Chromatherapy LED D MiaPlus E MiaMulti F AromaCloud C A D E F B FOR ELECTRICAL DIAGRAMS SEE ESSENCIA INSTALLATION INSTRUCTIONS MANUAL PAGES 20 21 4 FACTORY INSTALLED TURBINE ELECTRICAL WIRING THERMOMASSEUR Junction box Canada Junction box Canada TO GFCI Outlet Unit...

Page 17: ...th the ground and its clearance with the opening on top of the box Use shims if necessary and attach them to the ground WARNING Check the spacing from the bottom of the deck to the top of the plywood panel to clear the thickness of the finishing material plus a clearance of at least 1 16 0 2cm considering the thickness of the glue for the finishing Adjust the height of the bath to the floor if nec...

Page 18: ...he box opening for the final installation of the bath on the floor A ESSENCIA DESIGN 7438 DRAIN CONNECTION B DECK OF THE BATH CLEARANCE 4 10cm minimum WARNING Leave the plastic film on the bath and place a drop cloth a cover in the bath during installation Connect the drain A Perform a leak test before completing the box installation Once the bath is placed on the floor it is recommended to leave ...

Page 19: ...ver in the bath during installation Cut the bath contour on the support panel according to the EXTERIOR contour line drawn on the installation template AND LEAVE an additional 1 4 0 6cm of clearance Check that the space left on top of the support panel leaves a 1 16 0 2cm clearance with the top WARNING Keep minimum 22 x18 55cmx46cm access to perform electrical plumbing connections and facilitate r...

Page 20: ...h on the top panel following the UNDERMOUNT line of the installation template Apply a bead of silicone on the contour of the bath to make sure the bottom of the box is sealed 5 ELECTRONIC CONTROL INSTALLATION MIAPLUS MIAMULTI OPTIONAL LOCATION PAGE 15 6 REMOTE MOUNTING OF TURBINE PAGE16 7 REMOTE MOUNTING OF TURBINE AIR PIPE THERMOMASSEUR PAGE 17 7 REMOTE MOUNTING OF TURBINE ELECTRICAL CONNECTIONS ...

Reviews: