12
NOKORI - installation
NOKORI
®
BATH
INSTALLATION INSTRUCTIONS
1 800 463.2187
Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Printed in Canada. Copyright © April 2017 BainUltra Inc. All rights reserved. 45200618
PARTS AND TOOLS REQUIRED
5
ELECTRONIC CONTROL INSTALLATION – MIAPLUS
®
& MIAMULTI
®
(OPTIONAL) LOCATION
5
ELECTRONIC CONTROL INSTALLATION – DOT
Jig saw with fine cut blade
Drill
1/4 in. drill bit
Push wiring through drilled holes.
Remove protective film from watertight seal.
Secure to the wall with permanent waterproof
sealant (mold-free clear silicone for bathrooms).
Secure temporarily with a tape for about 24 h.
Push wiring through drilled holes.
Remove protective film from watertight seal.
Secure to the wall with permanent waterproof
sealant (mold-free clear silicone for bathrooms).
Secure temporarily with a tape for about 24 h.
TOOLS REQUIRED
TOUCH PAD INSTALLATION
TOUCH PAD INSTALLATION
LOCATION:
Determine the most convenient location, on the wall close to tub. Peel off the protective film of sticker
behind the control. You can add a silicone bead to secure to the wall.
WARNINGS
• Baths from Nokori
®
collection cannot be drilled for faucet installation. Faucets must be freestanding or wall-mounted model
•
DRILLING OF WALL:
Refer to the
Cutting Template on page 43
for the location and diameter of the holes.
WARNING
• If the control is not factory installed, you will find it attached to the turbine, or to the electronic control modules.
7/8 in. Hole saw
Drill
TOOLS REQUIRED
DOT WarmTouchShell
®
(WTS)
DOT Chromatherapy (LED)
REMOTE MOUNTING
OF TURBINE
WITH ACCESS
UNDER BATH