23
www.bainultra.com
Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.
NOKORI
®
BATH
INSTALLATION INSTRUCTIONS
NOKORI - installation
PARTS AND TOOLS REQUIRED
WARNINGS
• Be sure the floor is leveled. Use shims as needed.
• Do not remove the protective plastic film on the tub and place a drop-cloth in the tub during installation to protect the acrylic.
• The tub must be securely anchored to floor.
• Apply a bead of silicone around the perimeter of the bath once on the floor.
4
BATH INSTALLATION
HELPFUL TIPS:
• Carefully place the tub on its side,
on a blanket or a corrugated cardboard.
• To easily manipulate the bathtub in a safe
way during installation, we recommend
using moving straps.
Measure
& Align (2x)
REMOTE MOUNTING OF TURBINE
PIPING & WIRING
UNDER
FLOOR &
NO ACCESS
UNDER BATH