30
NOKORI - installation
NOKORI
®
BATH
INSTALLATION INSTRUCTIONS
1 800 463.2187
Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Printed in Canada. Copyright © April 2017 BainUltra Inc. All rights reserved. 45200618
PARTS AND TOOLS REQUIRED
• Air pipe*
• GEYSAIR*
• Electrical wiring*
(optional therapies)
ISLAND TUB DRAIN
®
(ITD)
(*): LOCATION SHOWN AS AN EXAMPLE MAY DIFFER ACCORDING TO THE POSITION OF REMOTE COMPONENTS
AND LOCATION OF BATH. SEE PAGE 21 FOR INSTALLATION OF ISLAND TUB DRAIN
®
(ITD)
HELPFUL TIP:
To easily manipulate the bathtub in a safe way during installation, we recommend using moving straps.
WARNINGS
• Do not remove the protective plastic film on the bathtub and place a drop-cloth in the bath during installation
to protect the acrylic.
• The bath must be securely anchored to floor.
• Apply a bead of silicone around the perimeter of the bath once on the floor.
FOR NEXT STEPS, FOLLOW INSTRUCTIONS:
INSTALLATION – REMOTE MOUNTING OF TURBINE,
PIPING UNDER FLOOR WITH NO ACCESS UNDER BATH
3
ELECTRICAL WIRING OF OPTIONAL COMPONENTS .....................................................................................22
4
BATH INSTALLATION ...................................................................................................................................... 23
REMOTE MOUNTING OF TURBINE
PIPING & WIRING
ABOVE
FLOOR &
NO ACCESS
UNDER BATH