44
NOKORI - installation
NOKORI
®
BATH
INSTALLATION INSTRUCTIONS
1 800 463.2187
Monday to Thursday from 8 a.m. to 8 p.m. (EST) . Friday from 8 a.m. to 5 p.m. (EST)
Printed in Canada. Copyright © April 2017 BainUltra Inc. All rights reserved. 45200618
PARTS AND TOOLS REQUIRED
FOR NEXT STEPS FOLLOW THE INSTRUCTIONS:
TURBINE FACTORY INSTALLED WITH WIRING UNDER FLOOR AND NO ACCESS UNDER BATH
1
PLUMBING – FLOOR LAYOUT FOR PIPES AND ACCESS .................................................................................40
1
PLUMBING .................................................................................................................................................41
2
AIR VENT OPENING ...................................................................................................................................34
3
ELECTRICAL WIRING OF TURBINE AND GEYSAIR
®
(THERMOMASSEUR
®
)
TURBINE FACTORY INSTALLED
WIRING
ABOVE
FLOOR &
NO ACCESS
UNDER BATH
WARNING
• IF THE POWER SUPPLY OF THERAPEUTIC OPTIONS MUST BE ABOVE THE FLOOR, YOU MIGHT HAVE TO MAKE
AN ADDITIONAL OPENING ON ONE SIDE OF THE BATH, AS CLOSE AS POSSIBLE TO TURBINE AND CONTROLS.
Drill
Jig saw with fine cut blade
TOOLS REQUIRED
HELPFUL TIP:
• IF INSTALLATION IS FOR TURBINE FACTORY IN-
STALLED WITH WIRING ABOVE FLOOR AND NO
POSSIBLE ACCESS UNDER BATH, THE AIR VENT
OPENING CAN ALSO BE USED FOR PASSAGE OF
GEYSAIR HOSE AND ELECTRICAL WIRES.